Wingate
David Wingate, Surrey GB
Patent application number | Description | Published |
---|---|---|
20120122201 | Gas Flow Rate And Liquid Level Monitoring Apparatus - An incubator ( | 05-17-2012 |
Jeremy Richard Wingate, Essex GB
Patent application number | Description | Published |
---|---|---|
20100209988 | Bioremediation Materials - Microbially colonised charred biological material, such as charcoal, wherein the colonising microbes are capable of metabolising at least one selected environmental substance, such as a pollutant, and wherein a selective amount of the substance is present in the charred material provide protected colonies of environmentally active microbes useful in bioremediation, for example. | 08-19-2010 |
Jeremy Robert Wingate, Essex GB
Patent application number | Description | Published |
---|---|---|
20110008317 | CHARCOALS - Non-activated charcoals from living plant materials are useful as ion exchange agents for adsorbing cations from an environment, especially metal ions. | 01-13-2011 |
John Wingate, Milton Keynes GB
Patent application number | Description | Published |
---|---|---|
20160053603 | SYSTEM AND CONSOLE FOR MONITORING AND MANAGING WELL SITE OPERATIONS - A well advisor system and console for monitoring and managing well drilling and production operations. The system may be accessed through one or more workstations, or other computing devices, which may be located at a well site or remotely. The system is in communication with and receives input from various sensors. It collects real-time sensor data sampled during operations at the well site. The system processes the data, and provides nearly instantaneous numerical and visual feedback through a variety of graphical user interfaces (“GUIs”), which are presented in the form of an operation-specific console. The input and data provides information related to rate of penetration concerning a well being drilled, and present the information for related parameters in real time against a plotted “fairway” of determined maximum and minimum values, with a focus on the safety of the drilling operation. | 02-25-2016 |
John Wingate, Bristol GB
Patent application number | Description | Published |
---|---|---|
20120154177 | METHOD OF MONITORING AIRCRAFT BRAKE PERFORMANCE AND APPARATUS FOR PERFORMING SUCH A METHOD - A brake performance monitoring system operates by an energy differential calculated from brake demand energy and energy absorbed during a braking operation. A significant differential would be reported as a possible problem with the braking system. | 06-21-2012 |
John Wingate, Kew GB
Patent application number | Description | Published |
---|---|---|
20150310367 | SYSTEMS AND METHODS DETERMINING A BIT TRIPPING SCHEDULE AND BIT SELECTION BASED ON TOTAL COST OF DRILLING - Some embodiments of a method for optimizing drilling include determining at least one section of a wellbore for which to determine a schedule for replacing one or more drill bits during drilling the wellbore. Some embodiments of the method also include determining one or more constraints on the schedule for replacing the one or more drill bits. Some embodiments of the method also include determining, based on the one or more constraints, a plurality of scenarios for replacing the one or more drill bits during drilling the at least one section. Some embodiments of the method include determining, by one or more processors, a total cost for each scenario in the plurality of scenarios. Some embodiments of the method include identifying at least one scenario in the plurality of scenarios that has the lowest cost compared to other ones of the plurality of scenarios. | 10-29-2015 |
John Maclean Wingate, Bristol GB
Patent application number | Description | Published |
---|---|---|
20120259552 | MONITORING THE PHASE COMPOSITION OF PRODUCTION FLUID FROM A HYDROCARBON EXTRACTION WELL - A method of monitoring a phase composition resulting from different phases in production fluid from at least one well of a plurality of hydrocarbon production wells is provided. The method comprises modulating a flow of production fluid from the at least one well; passing the flow of production fluid from each of the plurality of wells through a multiphase flow meter common to the plurality of wells; and processing data from the multiphase flow meter by responding to the modulation of the flow of the production fluid from the at least one well to produce information relating to the phase composition of the production fluid from the at least one well. | 10-11-2012 |
John Maclean Wingate, Nailsea GB
Patent application number | Description | Published |
---|---|---|
20130068452 | SETTING THE VALUE OF AN OPERATIONAL PARAMETER OF A WELL - A method of setting the value of an operational parameter of a well is provided. The method includes providing a measure related to the actual value of the parameter; setting a maximum limit for the measure; setting a minimum limit for the measure; setting a demanded value for the parameter; and automatically overriding the demanded value if it is such that it would result in the measure exceeding the maximum limit or being below the minimum limit to produce an actual value for the parameter with results in the measure not exceeding the maximum limit and not being below the minimum limit | 03-21-2013 |