Patent application number | Description | Published |
20090261053 | Lattice mast crane and lattice mast boom - This invention relates to a lattice mast crane with a lattice mast boom to be luffed up in a vertical luffing plane, which comprises a pivot piece, a plurality of lattice pieces releasably connectable with each other, and a head piece. In accordance with the invention, the lattice mast boom includes a first and a second region, wherein in the first region the lattice mast boom includes at least two first strands of interconnected first lattice pieces extending in parallel in longitudinal direction of the boom, which are connected with the pivot piece via a lower cross-beam and with the head piece via an upper cross-beam, and wherein in the second region the lattice mast boom only consists of a second strand of interconnected second lattice pieces. | 10-22-2009 |
20110132860 | DERRICK CRANE - The present invention relates to a derrick crane having a main boom and a derrick boom whose tips are connected to one another via a main guying, with the main guying having a luffing rope arrangement of changeable length arranged between the main boom and the derrick boom to change the length of the main guying on the luffing up of the main boom and with at least two additional guying systems being provided which connect the main guying to the main boom, with the at least two additional g having a fixed length. | 06-09-2011 |
20110232375 | Construction Machine - The present disclosure relates to a construction machine having an undercarriage; a superstructure rotatably supported relative to the undercarriage by a revolving roller connection; and a control system, wherein measuring devices are arranged in the revolving roller connection for the force measurement in the directions of pulling and compression, and the control system determines the force in the axis direction of the axis of rotation as well as the torque which is caused by the eccentricity of the force with respect to the axis of rotation from the detected measured values of the measuring devices. From this, improved monitoring of the operational safety and stability of such a construction machine is achieved. | 09-29-2011 |
20120080397 | LATTICE MAST CRANE AND LATTICE MAST BOOM - A lattice mast crane having a lattice mast boom which can be luffed up in a vertical luffing plane and which comprises a pivotal connection piece, a plurality of lattice pieces releasably connectable to one another, and a head piece, with the lattice mast boom having a two-strand or multi-strand region, wherein at least one side part is releasably arranged at the pivotal connection piece and the two-strand or multi-strand region is arranged directly or indirectly at the pivotal connection piece and/or directly or indirectly at least one side part. | 04-05-2012 |
20120312767 | METHOD OF MONITORING CRANE SAFETY DURING THE SETUP PROCEDURE, AS WELL AS CRANE AND CRANE CONTROL - The present invention relates to an angle-related method of monitoring crane safety during the setup procedure of a crane, wherein the crane has a sensor system and a crane control and the crane control receives one or more measured values from the sensor system during the setup procedure and compares the measured value or values received with at least one corresponding limit value and triggers a measure on an exceeding and/or falling below of the limit value or values. | 12-13-2012 |
20150375971 | Process and System for the Calculation of Data for the Operation of a Crane - The invention relates to a process for the calculation of relevant data for the operation of at least one crane, particularly of a mobile crane, whereby the system comprises at least one crane, a communication network, as well as a data processing center, whereby, first of all, one or more parameters of the crane are determined on the crane and these are transmitted to the data processing center through the communication network and, in the data processing center, one or more items of data that are relevant for the operation of the crane are computed and/or selected on the basis of the one or more parameters received from the crane and the relevant data computed and/or selected for the operation of the crane is transmitted back to the at least one crane, particularly to its crane control. Furthermore, the invention relates to a system for the calculation and/or selection of data relevant to the operation of at least one crane that is suitable for the implementation of the process in accordance with the invention. | 12-31-2015 |