Patent application number | Description | Published |
20130154793 | SECURE CUSTOMER ACKNOWLEDGEMENT OF RELAY ACTUATION - A request for an acknowledgement using a private key may be generated and transmitting to a customer device. The acknowledgement may be received from the customer device and verified using a public key associated with a customer operating the customer device. A request for a current location of the customer device may be transmitted and the current location may be received. A determination that the current location is proximate to a meter may be made, and, in response to determining that the current location is proximate to the meter, the meter may be manipulated. | 06-20-2013 |
20130197702 | Systems and Methods for Managing a Power Distribution System - A system and method of determining priorities for restoration of power in a power distribution system includes collecting customer prioritization data for a set of customers. An inconvenience factor is determined from the customer prioritization data for each customer. A zone restoration factor is then determined from the inconvenience factor for each customer. The inconvenience factor takes into account the estimated outage time, the customer's back-up time, the willingness of the customer to use back-up devices, and customer's priority for the estimated outage time. | 08-01-2013 |
20130197706 | Systems and Methods for Dynamic Islanding to Minimize Load Shed During Restoration After a Fault - A system and method for minimizing load shed during restoration after a fault in a power distribution network includes collecting customer prioritization data for a set of customers and calculating an inconvenience factor from the customer prioritization data on each customer in the set of customers. A load reduction required for restoration is determined, and at least one zone to be isolated from the power distribution network based the load reduction and the inconvenience factor is identified. The identified zone may then be isolated from the distribution network. The customer prioritization data may include customer priority data, customer load data, customer back-up device data, customer available back-up time, data related to willingness of customer to use their back-up device. | 08-01-2013 |
20130218353 | POWER DISTRIBUTION NETWORK EVENT ANALYSIS - A method for power distribution network analysis includes receiving power distribution network event data from a plurality of data sources, filtering the power distribution network event data, normalizing the power distribution network event data, storing the power distribution network event data in an event database and retrieving, in a querying engine, the power distribution network event data. | 08-22-2013 |
20140049545 | METHOD AND SYSTEM FOR OPTIMIZING UTILITY COST - One embodiment of a method for optimizing utility cost comprises receiving a rating for at least one device comprising at least utility service usage information for the at least one device; receiving a desired time of use for the at least one device; receiving utility rate information comprising cost information for the utility service at various times over a defined time period; determining a total cost to use the at least one device at the desired time of use based on the utility service usage information for the at least one device and the utility rate information at the desired time of use; and determining an economical cost to use the at least one device based on the utility service usage information for the at least one device and the cost information for the utility service at various times over the defined time period. | 02-20-2014 |
20140100671 | END-USER BASED BACKUP MANAGEMENT - A device includes a network interface and a processor. The network interface is configured to receive one or more preferences of a customer related to the charging of at least one backup device of the consumer. The network interface is also configured to receive at least one notification of at least one predicted power disturbance. The processor is configured to utilize the one or more consumer preferences and the at least one notification to generate a charging schedule of the at least one backup device and to generate one or more charging notifications for charging the at least one backup device. The one or more charging notifications are based on the charging schedule. | 04-10-2014 |
20140100672 | Utility Based Backup Management - A device includes a network interface configured to receive one or more preferences of a consumer related to the charging of at least one backup device of the consumer. The device includes a processor configured to utilize the one or more consumer preferences to generate a charging schedule of the at least one backup device and generate one or more charging notifications for charging the at least one backup device, wherein the one or more charging notifications are based on the charging schedule. | 04-10-2014 |
20140207301 | METHODS AND SYSTEMS FOR RESTORING POWER BASED ON FORECASTED LOADS - A method for restoring power based on forecasted loads is described. The method includes identifying at least one zone within a power distribution network and predicting an energy demand of the at least one zone. The method also includes identifying at least one alternate source of power for the at least one zone, identifying at least one switch within the power distribution network capable of supplying power from the at least one alternate source to the at least one zone, and generating a restoration plan for restoring power to the at least one zone. | 07-24-2014 |