Class / Patent application number | Description | Number of patent applications / Date published |
166250170 | Including testing or treating tool having at least one actuatable packer | 38 |
20080251251 | Wellhead and control stack pressure test plug tool - A test plug tool for use in testing a pressure integrity of a pressure control stack mounted to a wellhead, including a joint between a casing and a casing support in the wellhead. The test plug tool includes a test plug of an appropriate diameter used to pressure test the pressure control stack as well as a joint between any one of a surface casing and the wellhead, an intermediate casing and an intermediate casing mandrel, and a production casing and a production casing mandrel. The pressure integrity of the wellhead is ensured at each stage of well drilling and well completion, and safety is improved. Optionally, a backpressure valve permits pressurized fluid that leaks below the test plug tool to flow upwardly through a central bore in a landing tool that is secured to the test plug tool to permit detection of the leak. | 10-16-2008 |
20080314585 | SYSTEM AND METHOD FOR MAKING DRILLING PARAMETER AND OR FORMATION EVALUATION MEASUREMENTS DURING CASING DRILLING - A casing drilling system includes a casing having a drill bit at one end. The drill bit is capable of drilling subsurface formations and formed from a material removable by drilling or chemical exposure. The chemical is substantially harmless to the casing. The system includes a centralizer affixed to an interior of the casing. The centralizer includes a receptacle therein for engaging a measurement while drilling tool. The centralizer is formed from a material removable by drilling or chemical exposure, wherein the chemical is substantially harmless to the casing. The system includes a measurement while drilling tool configured to move along the interior of the casing and to engage with the centralizer. The tool includes a device to measure a drilling parameter or a formation parameter. The tool including a latch at an upper end thereof for engagement with a retrieval tool moved through the interior of the casing. | 12-25-2008 |
20090107668 | MULTI-FUNCTION COMPLETION TOOL - A multi-functional completion tool which may be lowered into a wellbore coupled to a length of tubing, and then utilized to test various lengths of the tubing at pressure. The tool may also function as a positive plug and may also be used to set the packer, and is also useable as a tubing self-filling tool. Various retention elements are disposed within the tool and configured to release at predetermined pressures, or within predetermined ranges of pressure, thereby transforming the tool from a first configuration to a second configuration depending on the desired function. The tool may also contain a pressure-regulating assembly for regulating the differential pressure across the assembly. The tool may also include an indicator assembly for confirming that the tool has entered a plugging configuration, typically by altering a pressure within the tubing, such alteration being detectible at a surface location. | 04-30-2009 |
20090151937 | WELL THERMAL INSULATION FOR FORMATION SAMPLING OF VISCOUS FLUIDS - Evaluating a subterranean formation fluid by lowering a testing tool to a depth in a wellbore formed in a subterranean formation, limiting wellbore fluid convection near the depth with the testing tool, heating formation fluid in the subterranean formation near the depth, obtaining a sample of the heated formation fluid from the subterranean formation, and evaluating at least a portion of the sample of heated formation fluid obtained from the subterranean formation. | 06-18-2009 |
20090159275 | SYSTEM AND METHOD FOR OPTIMIZING PRODUCTION IN A WELL - A technique is provided for optimizing well production. Intervals are selected along a deviated wellbore, and a well test and treatment string is deployed in the wellbore. Each interval is then isolated to enable performance of desired testing. The test data obtained is evaluated to determine an appropriate remedial action which is then implemented via the well test and treatment string. The system and method enable the testing and treatment of a plurality of intervals along a horizontal well during the same run downhole. | 06-25-2009 |
20090218097 | WELLBORE INTERVENTION TOOL - The present invention provides a conveyance tool and a tool string having one or more sensors or cameras for detecting the performance of pre-existing perforations in a cased wellbore, and one or more perforation intervention tools mounted on the tool string and capable of performing remedial actions directed at at most one perforation and its nearest neighbors or at a single perforation. | 09-03-2009 |
20090260807 | SELECTIVE ZONAL TESTING USING A COILED TUBING DEPLOYED SUBMERSIBLE PUMP - An apparatus for measuring a property of a formation comprising a coiled tubing unit having one or more downhole sensors capable of being lowered into a wellbore, a submersible pump capable of being lowered into a wellbore by the coiled tubing unit, means to power the submersible pump, and a packer lowered into the wellbore by the coiled tubing unit to isolate a formation. A method of servicing a hydrocarbon well using one or more sensors, one or more packers, and a submersible pump, all lowered on coiled tubing into a well that penetrates a predetermined formation; and using surface well testing equipment, determining a property of a formation while flowing the well assisted by the submersible pump and using flow data measured using the surface well testing equipment integrated with pressure data measured using the one or more sensors lowered into the well penetrating the formation on the coiled tubing; treating the formation by pumping fluid into the formation using the coiled tubing; and repeating the determining a property of the formation while flowing the well as described above, wherein the coiled tubing remains deployed within the well throughout the determining, treating, and repeating the determining processes. | 10-22-2009 |
20090272530 | ANNULAR REGION EVALUATION IN SEQUESTRATION WELLS - Methods and related systems are described for making measurements at multiple locations in an annular region of a cased sequestration well. A first tool module is positionable within the well and adapted to directly or indirectly measure changing pressure at a first location in the annular region of the well. A pressure change is induced at the first location in the annular region. A second tool module is positionable within the well and adapted to directly or indirectly measure changing pressure at a second location in the annular region. The measured pressure changes at the second location are in response to the induced pressure change at the first location. | 11-05-2009 |
20090288824 | MULTI-ZONE FORMATION FLUID EVALUATION SYSTEM AND METHOD FOR USE OF SAME - A formation fluid evaluation system ( | 11-26-2009 |
20090301715 | Single Packer System For Use In A Wellbore - A technique involves collecting formation fluids through a single packer having at least one drain located within the single packer. The single packer is designed with an outer layer that expands to create a seal with a surrounding wellbore wall. The drain is located in the outer layer between its axial ends for collecting formation fluid which is routed from the drain to an axial end of the outer layer via a fluid flow passage. Mechanical fittings are mounted at the axial ends of the outer layer, and at least one of the mechanical fittings comprises one or more flow members coupled to the flow passage to direct the collected fluid from the packer. The one or more flow members are designed to move in a manner that freely allows radial expansion and contraction of the outer layer. | 12-10-2009 |
20090308604 | Single Packer System for Collecting Fluid in a Wellbore - A technique involves collecting formation fluids through a single packer having a plurality of sample collectors disposed along an expandable packer element. An anti-expansion device also is deployed along the expandable packer element to limit expansion in localized regions. Limiting the expansion can provide additional space or an increased production surface that facilitates collection of samples. | 12-17-2009 |
20100132940 | FOCUSED PROBE APPARATUS AND METHOD THEREFOR - Apparatus and methods for downhole formation testing including use of a probe having inner and outer channels adapted to collect or inject injecting fluids from or to a formation accessed by a borehole. The probe straddles one or more layers in laminated or fractured formations and uses the inner channels to collect fluid. | 06-03-2010 |
20100139914 | METHOD AND APPARATUS FOR AUTOMATED FLUID LOSS MEASUREMENTS OF DRILLING FLUIDS - A drilling fluid test device including a cell body having a pressurization inlet configured to allow for pressurization of the cell body, a fluid inlet configured to provide a test fluid, a filtrate outlet configured to discharge a filtrate, and a fluid outlet configured to discharge the fluid. The device also including a filter medium disposed in the cell body and a cleaning system disposed in the cell body and configured to clean the filter medium. Additionally, a method of testing a drilling fluid including injecting a drilling fluid into an automated testing cell, the automated testing cell having a filter medium. Furthermore, pressurizing the automated testing cell, forming a filter cake on the filter medium, and separating the drilling fluid into a filtrate and a residual drilling fluid. Additionally, transferring the filtrate to a filtrate collection vessel and determining a volume of filtrate in the filtrate collection vessel. | 06-10-2010 |
20100200225 | MULTI-FUNCTIONAL COMPLETION TOOL - A multi-functional completion tool which may be lowered into a wellbore coupled to a length of tubing, and then utilized to test various lengths of the tubing at pressure. The tool may also function as a positive plug, may be used to set a packer, and is also useable as a tubing self-filling tool. Various retention elements are disposed within the tool and configured to release at predetermined pressures, or within predetermined ranges of pressure, thereby transforming the tool from a first configuration to a second configuration depending on the desired function. The tool may use a flapper mechanism to regulate passage of fluids through the housing, and a piston and/or flow tube may also be utilized to lock the flapper in an open or closed orientation within the housing. | 08-12-2010 |
20100206561 | Apparatus and Method for Controlling the Connection and Disconnection Speed of Downhole Connectors - An apparatus ( | 08-19-2010 |
20100252256 | METHOD OF ISOLATING A DOWNHOLE ZONE FOR THE GATHERING OF DATA - A downhole tool including an inner mandrel, a first sealing element disposed around the inner mandrel, a second sealing mandrel disposed around the inner mandrel and axially below the first sealing elements, and a monitoring device disposed on the downhole tool between the first and second sealing elements. Also, a method of monitoring a downhole formation, the method including disposing a downhole monitoring tool in a wellbore, isolating a first production zone from a second production zone, wherein the first production zone is axially above the second production zone, and monitoring a condition of the first production zone. | 10-07-2010 |
20110114310 | DOWNHOLE FORMATION TESTER - A method according to one or more aspects of the present disclosure comprises disposing a tool in a wellbore, the tool comprising a displacement unit for pumping a fluid at least partially through the tool, a first flowline hydraulically connected to the displacement unit through a valve network, and a second flowline hydraulically connected to the displacement unit; pumping a fluid from the first flowline to the second flowline; monitoring a pressure at a chamber of the displacement unit; and monitoring flowing pressure in the first flowline across the valve network from the displacement unit. | 05-19-2011 |
20110162835 | INTERFACE FOR DEPLOYING WIRELINE TOOLS WITH NON-ELECTRIC STRING - Embodiments of the present invention generally relate to a method and/or apparatus for deploying wireline tools with a non-electric string. In one embodiment, a method of determining a free point of a tubular string stuck in a wellbore includes deploying a tool string in the stuck tubular with a non-electric string. The free point assembly includes a battery, a controller, and a free point tool. The method further includes activating the free point tool by the controller. The free point tool contacts an inner surface of the stuck tubular string. The method further includes applying a tensile force and/or torque to the stuck tubular string; and measuring a response of the tubular string with the free point tool. | 07-07-2011 |
20110272148 | METHODS, SYSTEMS AND APPARATUS FOR COILED TUBING TESTING - A method and apparatus for testing a multi-zone reservoir while reservoir fluids are flowing from within the wellbore. The method and apparatus enables isolation and testing of individual zones without the need to pull production tubing. This abstract allows a searcher or other reader to quickly ascertain the subject matter of the disclosure. It may not be used to interpret or limit the scope or meaning of the claims. 37 CFR 1.72(b). | 11-10-2011 |
20110277997 | TOOL TO DETERMINE FORMATION FLUID MOVEMENT - The present disclosure relates to one or more apparatuses and methods to determine fluid movement within a formation. The apparatus includes a first packer configured to selectively engage a wall of a borehole of the formation, an outlet disposed adjacent to the first packer, wherein the outlet is configured to pump a first fluid therefrom and into the formation, and a detecting tool configured to detect the first fluid within the formation. Movement of the first fluid may be determined based upon the detection of the first fluid within the formation. | 11-17-2011 |
20110315377 | Sensors in Swellable Materials - A downhole equipment includes a tubing configured for deployment in a wellbore; and a measurement unit disposed on outside of the tubing, wherein the measurement unit comprises a detector embedded in a swellable material. A method for formation property measurement includes deploying a downhole equipment to a predetermined location inside a wellbore, wherein the downhole equipment comprising a tubing and a measurement unit dispose on outside of the tubing, wherein the measurement unit comprises a detector embedded in a swellable material; allowing the swellable material to swell; and performing measurements. | 12-29-2011 |
20120055669 | SYSTEMS AND METHODS FOR MONITORING A PARAMETER OF A SUBTERRANEAN FORMATION USING SWELLABLE MATERIALS - A system for monitoring a parameter of a subterranean formation using swellable materials is disclosed. The system may include a sensor device configured to detect a parameter of a subterranean formation. The system may also include a swellable material configured to position the sensor device toward a surface of the subterranean formation by swelling of the swellable material. The system may further include a telescoping section coupled to the sensor device and emplaced in the swellable material. The telescoping section may be configured to extend with the positioning of the sensor device. | 03-08-2012 |
20130092372 | APPARATUS AND METHODS OF FLOW TESTING FORMATION ZONES - A method of flow testing multiple zones in a wellbore includes lowering a tool string into the wellbore. The tool string includes an inflatable packer or plug and an electric pump. The method further includes operating the pump, thereby inflating the packer or plug and isolating a first zone from one or more other zones; monitoring flow from the first zone; deflating the packer or plug; moving the tool string in the wellbore; and operating the pump, thereby inflating the packer or plug and isolating a second zone from one or more other zones; and monitoring flow from the second zone. The zones are monitored in one trip. | 04-18-2013 |
20130112408 | PORTED PACKER - Disclosed is a packer that is ported to provide fluid communication through the packer between the wellbore annulus above the packer and the wellbore annulus below the packer. Such a ported packer can be used to allow for pressure testing the casing and/or for controlling a failed well. | 05-09-2013 |
20130133883 | DUAL DOWNHOLE PRESSURE BARRIER WITH COMMUNICATION TO VERIFY - Apparatus and method are provided for placing a dual pressure barrier in a vertical or horizontal well and verifying by pressure sensors in the well that the pressure barriers are operable. Communication of data from the well may be by electromagnetic or acoustic signals, and the data may be acquired on a ship near the well. | 05-30-2013 |
20130168087 | DOWNHOLE TOOL AND METHOD - A downhole packer for providing a seal in a well bore to allow integrity testing of well bore with drill ahead capability immediately thereafter has a disengageable packer assembly wherein the packer element may be rendered disengageable by mounting the packer to the string using a tool body ( | 07-04-2013 |
20130186618 | METHOD AND DEVICE FOR ZONAL ISOLATION AND MANAGEMENT OF RECOVERY OF HORIZONTAL WELL DRAINED RESERVES - The invention relates to the oil and gas production industry, in particular, to development and production of oil reservoirs with various permeability zones, specifically, with lateral/lateral horizontal holes, drilled from the production casing. The method described includes running into the well of a tubing string with a cable, control devices in form of electrical valves, measurement pressure and temperature sensors, and one or more packers for isolation of the downhole space, in which information from the sensors is passed to the measurement unit at the wellhead, and signals for opening/closing of the control devices are transferred from the wellhead control unit by the cable. A device for carrying out this method is also described. | 07-25-2013 |
20130213645 | Downhole Formation Testing and Sampling Apparatus Having a Deployment Packer - A downhole formation testing and sampling apparatus. The apparatus includes an expandable packer having a radially contracted running configuration and a radially expanded deployed configuration. At least one elongated sealing pad is operably associated with the expandable packer such that operating the expandable packer from the running configuration to the deployed configuration establishes a hydraulic connection between the at least one elongated sealing pad and the formation. The at least one elongated sealing pad has at least one opening establishing fluid communication between the formation and the interior of the apparatus. In addition, the at least one elongated sealing pad has an outer surface operable to seal a region along a surface of the formation to establish the hydraulic connection therewith. The at least one elongated sealing pad further has at least one recess operable to establish fluid flow from the formation to the at least one opening. | 08-22-2013 |
20130240205 | SYSTEMS AND METHODS FOR RESERVOIR PRODUCTION MANAGEMENT - A reservoir production management system includes a plurality of dielectric spectrometers disposed at different locations along the length of production tubing within a wellbore, each of the plurality dielectric spectrometers being in fluid communication with separate producing zones of the reservoir, wherein the plurality of dielectric spectrometers are configured to detect one or more dielectric properties by measuring the response of incident radio waves through fluids from each of the respectively separate producing zones, and a plurality of valves in the production tubing to selectively control production from each of the respectively separate producing zones in response to detected dielectric fluid properties. | 09-19-2013 |
20140020890 | Sampling Assembly For A Single Packer - A sampling assembly of a single packer assembly may have more guard drains than sampling drains. The single packer assembly having the sampling assembly may be deployed in a wellbore formed in a subterranean formation, and the single packer assembly may be deployed on a wireline cable or another deployment or conveyance. The number and the area of the sampling drains, the number and the area of the guard drains, and the positions of the sampling drains and the guard drains may be designed so that the guard drains which are operational may provide a fluid intake rate exceeding a predetermined threshold if one of the guard drains is congested and/or blocked. | 01-23-2014 |
20140054030 | SPEED CONTROL DEVICES AND METHODS FOR DROP DOWN TOOLS - An apparatus for evaluating an earth formation intersected by a wellbore may include a logging tool conveyed into the wellbore through a drilling tubular, a speed control device associated with the logging tool, and a sensor operatively associated with the logging tool. In use, the speed control device varies an annular flow space between the speed control device and a surface adjacent to control speed. The flow space may be varied using a annular member that flexes between a nominal diameter and a second larger diameter. | 02-27-2014 |
20140054031 | METHOD AND SYSTEM FOR WELL AND RESERVOIR MANAGEMENT IN OPEN HOLE COMPLETIONS AS WELL AS METHOD AND SYSTEM FOR PRODUCING CRUDE OIL - According to the method for well and reservoir management in open hole completions, a data acquisition module ( | 02-27-2014 |
20140158350 | ALL PURPOSE PUMPDOWN INSTRUMENT - An apparatus for flowing a tool string along a wellbore tubular may include a flow restrictor having a diametrically expanded position and a diametrically retracted position. The flow restrictor may include at least one sealing element that sealingly engages the wellbore tubular when in the diametrically expanded position. The apparatus also includes an actuator configured to move the at least one sealing element to at least a position intermediate of the open and the closed position. The actuator may be responsive to a control signal that is generated locally or transmitted from a remote location. | 06-12-2014 |
20140166277 | ELECTRONICALLY SET AND RETRIEVABLE ISOLATION DEVICES FOR WELLBORES AND METHODS THEREOF - Sealing devices such as packers comprise an expandable sealing element that is inflated and/or deflated by an electrically-activated pump disposed in a wellbore so that the sealing element can be set and retrieved from the wellbore. The pump is disposed downhole in close proximity to the expandable sealing element and is electronically associated with a surface processing unit located at the surface of the wellbore. In certain embodiments, an electric motor electronically associated with the surface processing unit drives the pump to flow a fluid into a chamber of the expandable sealing element to inflate the expandable sealing element and pumps the fluid out of the chamber of the expandable sealing element to deflate the expandable sealing element. Multiple sealing elements can be disposed on a tool or work string and all can be addressable and individually and separately controlled by the surface processing unit. | 06-19-2014 |
20140182847 | Wellhead Sealing System and Method - A system for sealing a wellhead. The system includes a setting frame, a driver cylinder selectively applying an axial motion, an adaptor attached to the wellhead, and a power mandrel operatively attached to the driver cylinder. The system may also include a setting sleeve attached to the power mandrel, with the setting sleeve having a packer element, wherein the setting sleeve is responsive to a pressure applicator and retractor device so that the packer element is expanded within the master valve. A method of isolating a wellbore is also disclosed. | 07-03-2014 |
20150007985 | Packer-Packer Vertical Interference Testing - A downhole tool having multiple packers and a controller operable to operate the packers to establish upper, middle, and lower intervals. The controller then establishes the upper and lower intervals at formation pressure, and establishes the middle interval at hydrostatic pressure. The controller then creates a pressure signal in one of the upper and lower intervals and then records a resulting pressure transient in both of the upper and lower intervals. The controller is also operable to establish the middle interval at formation pressure and establish the upper and lower intervals at below hydrostatic pressure but above formation pressure, and then create the pressure signal in the middle interval and subsequently record a resulting pressure transient in the middle interval. | 01-08-2015 |
20150300154 | BARRIER TESTING METHOD - The present invention relates to a barrier testing method for testing a production casing in a borehole ( | 10-22-2015 |
20190145252 | Embeddable Downhole Probe | 05-16-2019 |