Tauveron
Nicolas Tauveron, Grenoble FR
Patent application number | Description | Published |
---|---|---|
20120314830 | INSTALLATION FOR PRODUCING POWER FROM A GAS-COOLED FAST NUCLEAR REACTOR - A power production installation including a primary circuit containing gas passing via a nuclear reactor, via a first heat exchanger, and via a blower. A secondary circuit containing incondensable gas passes via the first heat exchanger, and via a turbine and a compressor fitted on the same shaft. The blower is driven by the shaft. The gases in the primary and secondary circuits are of the same nature, and the pressure in the secondary circuit is automatically regulated by the pressure in the primary circuit. | 12-13-2012 |
Pierre Tauveron US
Patent application number | Description | Published |
---|---|---|
20150088271 | METHOD OF AUTOMATED PROCESSING OF TASKS - A method of processing tasks having at least one action server and at least one production server (SP) in which the action servers execute the control of the tasks in real time and in a direct and priority manner. This control is master and integrates all the changes of states that may have occurred on the internal elements of the system and on the external elements. The missing elements corresponding to these changes of state are classed into four categories: internal or external, deterministic or nondeterministic. For each of these categories a method of resolution is formulated at the level of the production server (SP). The system includes at least two data transmission buses: a ‘process’ bus (BP) linking the action servers and action terminals and desks (R | 03-26-2015 |
Pierre Tauveron, Lyon FR
Patent application number | Description | Published |
---|---|---|
20150088271 | METHOD OF AUTOMATED PROCESSING OF TASKS - A method of processing tasks having at least one action server and at least one production server (SP) in which the action servers execute the control of the tasks in real time and in a direct and priority manner. This control is master and integrates all the changes of states that may have occurred on the internal elements of the system and on the external elements. The missing elements corresponding to these changes of state are classed into four categories: internal or external, deterministic or nondeterministic. For each of these categories a method of resolution is formulated at the level of the production server (SP). The system includes at least two data transmission buses: a ‘process’ bus (BP) linking the action servers and action terminals and desks (R | 03-26-2015 |