Patents - stay tuned to the technology

Inventors list

Assignees list

Classification tree browser

Top 100 Inventors

Top 100 Assignees


Robert D. Turney, Watertown US

Robert D. Turney, Watertown, WI US

Patent application numberDescriptionPublished
20110093133CONTROLLERS AND METHODS FOR PROVIDING COMPUTERIZED GENERATION AND USE OF A THREE DIMENSIONAL SURGE MAP FOR CONTROL OF CHILLERS - A controller for a chiller includes processing electronics configured to detect a plurality of surge events. The processing electronics calculate a point for each detected surge event in at least a three dimensional coordinate system. The three dimensional coordinate system describes at least three conditions of the chiller when the surge event was detected. The processing electronics are configured to calculate a surface map for the at least three dimensional coordinate system using the calculated points. The processing electronics are further configured to control at least one setpoint for the chiller using the calculated surface map.04-21-2011
20120117989METHOD AND APPARATUS FOR VARIABLE REFRIGERANT CHILLER OPERATION - A refrigeration system includes a compressor, a condenser, an expansion device, an evaporator, and an additional refrigerant vessel connected in a closed refrigerant loop. The additional refrigerant vessel is connected to the condenser at the high pressure side by a first valve and to the evaporator at a low pressure side by a second valve. A controller controls operation of the first valve and the second valve. Only one of the first valve and the second valve may be open at the same time. Refrigerant from the additional refrigerant vessel may be added to the closed refrigerant loop when the controller receives a low refrigerant level indication of in the evaporator. Refrigerant may also be removed from the closed refrigerant loop when the controller receives a high refrigerant level indication in the evaporator.05-17-2012
20140026598METHODS AND CONTROLLERS FOR PROVIDING A SURGE MAP FOR THE MONITORING AND CONTROL OF CHILLERS - A controller for a chiller includes processing electronics configured to detect a plurality of surge events. The processing electronics create a surge map by calculating and plotting a point for each detected surge event in an at least two dimensional coordinate system. The surge map is displayed through the use of an electronic display system. The surge map describes at least three conditions of the chiller when the surge event was detected through the use of axis and non-axis representations. The processing electronics are further configured to control at least one setpoint for the chiller using the calculated surge map.01-30-2014
20140214214SYSTEMS AND METHODS FOR RAPID DISTURBANCE DETECTION AND RESPONSE - A method for detecting and responding to disturbances in a HVAC system using a noisy measurement signal and a signal filter is provided. The method includes detecting a deviation in the noisy measurement signal, resetting the filter in response to a detected deviation exceeding a noise threshold, filtering the noisy measurement signal using the signal filter to determine an estimated state value, and determining that a disturbance has occurred in response to the estimated state value crossing a disturbance threshold. In some embodiments, the method further includes performing one or more control actions in response to the detection of a disturbance.07-31-2014
20150316902HIGH LEVEL CENTRAL PLANT OPTIMIZATION - An optimization system for a central plant includes a processing circuit configured to receive load prediction data indicating building energy loads and utility rate data indicating a price of one or more resources consumed by equipment of the central plant to serve the building energy loads. The optimization system includes a high level optimization module configured to generate an objective function that expresses a total monetary cost of operating the central plant over an optimization period as a function of the utility rate data and an amount of the one or more resources consumed by the central plant equipment. The high level optimization module is configured to optimize the objective function over the optimization period subject to load equality constraints and capacity constraints on the central plant equipment to determine an optimal distribution of the building energy loads over multiple groups of the central plant equipment.11-05-2015
20150316903LOW LEVEL CENTRAL PLANT OPTIMIZATION - Systems and methods for low level central plant optimization are provided. A controller for the central plant uses binary optimization to determine one or more feasible on/off configurations for equipment of the central plant that satisfy operating constraints and meet a thermal energy load setpoint. The controller determines optimum operating setpoints for each feasible on/off configuration and generates operating parameters including at least one of the feasible on/off configurations and the optimum operating setpoints. The operating parameters optimize an amount of energy consumed by the central plant equipment. The controller outputs the generated operating parameters via a communications interface for use in controlling the central plant equipment.11-05-2015
20150316946INCORPORATING A LOAD CHANGE PENALTY IN CENTRAL PLANT OPTIMIZATION - An optimization system for a central plant includes a processing circuit configured to receive load prediction data indicating building energy loads and utility rate data indicating a price of one or more resources consumed by equipment of the central plant to serve the building energy loads. The optimization system includes a high level optimization module configured to generate an objective function that expresses a total monetary cost of operating the central plant over the optimization period as a function of the utility rate data and an amount of the one or more resources consumed by multiple groups of the central plant equipment. The optimization system includes a load change penalty module configured to modify the objective function to account for a load change penalty resulting from a change in an amount of the building energy loads assigned to one or more of the groups of central plant equipment.11-05-2015
20160098022SYSTEM IDENTIFICATION AND MODEL DEVELOPMENT - A controller for a building system receives training data that includes input data and output data. The output data measures a state of the building system affected by both the input data and an extraneous disturbance. The controller performs a two-stage optimization process to identify system parameters and Kalman gain parameters of a dynamic model for the building system. During the first stage, the controller filters the training data to remove an effect of the extraneous disturbance from the output data and uses the filtered training data to identify the system parameters. During the second stage, the controller uses the non-filtered training data to identify the Kalman gain parameters. The controller uses the dynamic model with the identified system parameters and Kalman gain parameters to generate a setpoint for the building system. The building system uses the setpoint to affect the state measured by the output data.04-07-2016

Patent applications by Robert D. Turney, Watertown, WI US

Website © 2016 Advameg, Inc.