Patent application number | Description | Published |
20090256575 | ELECTROLOCATION APPARATUS AND METHODS FOR MAPPING FROM A SUBTERRANEAN WELL - In some embodiments, apparatus useful for determining at least one dimension of at least one geological feature of an earthen formation from a subterranean well bore includes at least two emitting electrodes and at least one sensing electrode disposed in the well bore. The emitting electrodes are configured to create an electric field and the at least one sensing electrode is configured to detect perturbations in the electric field created by at least one target object. | 10-15-2009 |
20100301128 | FRAGRANCE DISPENSING WICK AND METHOD - A wick which comprises a network matrix ceramic that is contacted either directly or indirectly with a liquid composition such as a fragrance-containing composition. The wick absorbs and transports the liquid composition through capillary action, and the composition is subsequently diffused into the surrounding ambient atmosphere. | 12-02-2010 |
20110118155 | LIGHT-WEIGHT PROPPANT FROM HEAT-TREATED PUMICE - A process for forming a strong, low-density proppant, which process includes heating pumice particulates, or shaped agglomerates thereof, so as to form heat-treated pumice particulates, or heat-treated, shaped pumice agglomerates, having an apparent density of 2.4 or less and a crush resistance of no more than 10% fines at 4000 psi. Proppants, and well treatment fluids comprising proppants, meeting these characteristics and processes for treating subterranean formations using fluids which include such proppants are also described. | 05-19-2011 |
20130043873 | APPARATUS AND METHODS FOR PROVIDING INFORMATION ABOUT ONE OR MORE SUBTERRANEAN FEATURE - A method of approximating or determining at least one dimension or other characteristic of at least one underground geological feature in a zone of interest proximate to a well bore includes generating an electric field in the zone of interest. At least two sensing electrodes are provided in the well bore and configured to detect differences therebetween in electric potential caused by at least one target object in the zone of interest. Proppant containing signal generating devices (SGD) is delivered into the geological feature(s). The SGD generate a detectable signal in response to at least one downhole condition or property. At least one receiver receives the detectable signals and provides data relating thereto. At least one dimension or other characteristic of the geological feature is approximated or determined based at least partially upon data provided by the sensing electrodes and receiver(s). | 02-21-2013 |
20130153222 | LIGHTWEIGHT HOLLOW PARTICLES FOR USE IN CEMENTING - A lightweight composite having an activated surface contains a lightweight hollow core particle having cement grains which may be adhered to the hollow core or embedded in the surface of the hollow core. The hollow core particle may be prepared from calcium carbonate and a mixture of clay, such as bentonite, and a glassy inorganic material, such as glass spheres, glass beads, glass bubbles, borosilicate glass and fiberglass. | 06-20-2013 |
20130233550 | Set-Delayed Cement Compositions Comprising Pumice and Associated Methods - A variety of methods and compositions are disclosed, including, in one embodiment, a method of cementing in a subterranean formation, comprising: providing a set-delayed cement composition comprising water, pumice, hydrated lime, and a set retarder; activating the set-delayed cement composition; introducing the set-delayed cement composition into a subterranean formation; and allowing the set-delayed cement composition to set in the subterranean formation. | 09-12-2013 |
20130248183 | Cement Set Activators for Set-Delayed Cement Compositions and Associated Methods - Disclosed herein are cement compositions and methods of using set-delayed cement compositions in subterranean formations. A method of cementing in a subterranean formation, may comprise providing a set-delayed cement composition comprising water, pumice, hydrated lime, and a set retarder, activating the set-delayed cement composition with a cement set activator, wherein the cement set activator comprises at least one activator selected from the group consisting of nanosilica, a polyphosphate, and combinations thereof, introducing the set-delayed cement composition into a subterranean formation, and allowing the set-delayed cement composition to set in the subterranean formation. | 09-26-2013 |
Patent application number | Description | Published |
20140000893 | Set-Delayed Cement Compositions Comprising Pumice and Associated Methods | 01-02-2014 |
20140020895 | Foaming of Set-Delayed Cement Compositions Comprising Pumice and Hydrated Lime - A variety of methods and compositions are disclosed, including, in one embodiment a method a cementing in a subterranean formation comprising: providing a set-delayed cement composition comprising water, pumice, hydrated lime, and a set retarder; foaming the set-delayed cement composition; activating the set-delayed cement composition; introducing the set-delayed cement composition into a subterranean formation; and allowing the set-delayed cement composition to set in the subterranean formation. Additional methods, foamed set-delayed cement composition, and systems for cementing are also provided. | 01-23-2014 |
20140034313 | Cement Set Activators for Cement Compositions and Associated Methods - Disclosed herein are cement compositions and methods of using cement compositions in subterranean formations. An embodiment comprises a method of cementing in a subterranean formation comprising: providing a cement composition comprising water, a pozzolan, hydrated lime, and a zeolite activator; introducing the cement composition into a subterranean formation; and allowing the cement composition to set in the subterranean formation, wherein the zeolite activator accelerates compressive strength development of the cement composition. | 02-06-2014 |
20140034314 | Mitigation of Contamination Effects in Set-Delayed Cement Compositions Comprising Pumice and Hydrated Lime - Methods and compositions for cementing are disclosed. Embodiments include a method of cementing comprising: providing a set-delayed cement composition comprising water, pumice, hydrated lime, a primary set retarder, a secondary set retarder; activating the set-delayed cement composition to produce an activated cement composition; introducing the activated cement composition into a subterranean formation; and allowing the activated cement composition to set in the subterranean formation. | 02-06-2014 |
20140048267 | Two-Part Set-Delayed Cement Compositions - A variety of methods and compositions are disclosed, including, in one embodiment a method of cementing comprising: providing a pozzolan slurry comprising a pozzolan and water; providing a lime slurry comprising hydrated lime and water; allowing the pozzolan slurry and the lime slurry to remain separate for about one day or longer; mixing the pozzolan slurry and the lime slurry to form a cement composition; and allowing the cement composition to set. | 02-20-2014 |
20140083701 | Cement Set Activators for Set-Delayed Cement Compositions and Associated Methods - Disclosed herein are cement compositions and methods of using set-delayed cement compositions in subterranean formations. In one embodiment, a method of cementing in a subterranean formation is described. The method may comprise providing a set-delayed cement composition comprising water, pumice, hydrated lime, and a set retarder; activating the set-delayed cement composition with a liquid additive to produce an activated cement composition, wherein the liquid additive comprises a monovalent salt, a polyphosphate, a dispersant, and water; and allowing the activated cement composition to set. | 03-27-2014 |
20140090843 | Use of Synthetic Smectite in Set-Delayed Cement Compositions - Disclosed herein are cement compositions and methods of using set-delayed cement compositions in subterranean formations. In one embodiment a method of cementing in a subterranean formation is described. The method comprises providing a set-delayed cement composition comprising pumice, hydrated lime, a cement set retarder, a synthetic smectite, and water; introducing the set-delayed cement composition into a subterranean formation; and allowing the set-delayed cement composition to set in the subterranean formation. | 04-03-2014 |
20140174741 | Settable Compositions and Methods of Use - Disclosed herein are settable compositions and methods of using settable compositions in a wellbore. In one embodiment a method of introducing a settable composition into a wellbore is described. The method comprises providing a settable composition comprising pumice, hydrated lime, a set retarder, and water. Introducing the settable composition into a wellbore. Allowing the settable composition to remain static in the wellbore, wherein the settable composition remains in a pumpable fluid state for a period of about 1 day or longer while static in the wellbore. | 06-26-2014 |
20140190696 | Lost Circulation Treatment Fluids Comprising Pumice and Associated Methods - Disclosed are lost circulation treatment fluids and methods of sealing lost circulation zones. Embodiments include a method of sealing a lost circulation zone. The method comprises circulating a lost circulation treatment fluid in a wellbore, wherein the lost circulation treatment fluid comprises: pumice, hydrated lime, a set retarder, and water; and allowing the lost circulation treatment fluid to set in the lost circulation zone to seal the lost circulation zone. | 07-10-2014 |
20140202698 | Set-Delayed Cement Compositions Comprising Pumice and Associated Methods - Disclosed herein are cement compositions and methods of using set-delayed cement compositions in subterranean formations. An embodiment includes a method of cementing in a subterranean formation comprising: providing a cement composition comprising water, pumice, hydrated lime, a set retarder, and a strength enhancer, wherein the strength enhancer comprises at least one material selected from the group consisting of cement kiln dust, slag, amorphous silica, a pozzolan, and any combination thereof; introducing the cement composition into the subterranean formation; and allowing the cement composition to set in the subterranean formation. | 07-24-2014 |
20140216746 | Plugging and Abandoning a Well Using a Set-Delayed Cement Composition Comprising Pumice - Disclosed herein are cement compositions and methods of using set-delayed cement compositions in subterranean formations. In one embodiment a method of plugging a wellbore is described. The method comprises providing a set-delayed cement composition comprising pumice, hydrated lime, a cement set retarder, and water; activating the set-delayed cement composition to produce an activated set-delayed cement composition; introducing the activated set-delayed cement composition into the wellbore; and allowing the activated set-delayed cement composition to form a plug in the wellbore that has a permeability of less than 0.1 millidarcy. | 08-07-2014 |
20140373756 | Set-Delayed Cement Compositions Comprising Pumice and Associated Methods - A variety of methods and compositions are disclosed, including, in one embodiment, a method of cementing in a subterranean formation, comprising: providing a set-delayed cement composition comprising water, pumice, hydrated lime, and a set retarder; activating the set-delayed cement composition; introducing the set-delayed cement composition into a subterranean formation; and allowing the set-delayed cement composition to set in the subterranean formation. | 12-25-2014 |
20140374098 | Set-Delayed Cement Compositions Comprising Pumice and Associated Methods - A variety of methods and compositions are disclosed, including, in one embodiment, a method of cementing in a subterranean formation, comprising: providing a set-delayed cement composition comprising water, pumice, hydrated lime, and a set retarder; activating the set-delayed cement composition; introducing the set-delayed cement composition into a subterranean formation; and allowing the set-delayed cement composition to set in the subterranean formation. | 12-25-2014 |