Laban
David Laban, Schwedt DE
Patent application number | Description | Published |
---|---|---|
20100242349 | PROCESS FOR THE CONTINUOUS HYDROGENATION OF TRIGLYCERIDE CONTAINING RAW MATERIALS - Process for the continuous hydrogenation of triglyceride containing raw materials in a fixed bed reactor system having several catalyst beds arranged in series and comprising hydrogenation catalyst. The raw material feed, hydrogen containing gas and diluting agent are passed together through the catalyst beds at hydrogenation conditions. The raw material feed stream as well as the stream of hydrogen containing gas are divided into an equal number of different partial streams. These are each passed to one catalyst bed in such a manner that the weight ratio of diluting agent to raw material feed is essentially the same at the entrance of all catalyst beds and does not exceed 4:1. The claimed process is preferably conducted at low temperatures and allows the utilization of existing units due to the low recycle ratio. Further, a sufficient excess of hydrogen is used so that no valuable product is lost through decarb-reactions. | 09-30-2010 |
John Gary Ryan Laban, Toronto CA
Patent application number | Description | Published |
---|---|---|
20140180747 | REALTIME SCHEDULE MANAGEMENT INTERFACE - Embodiments are directed towards generating and managing schedules. In at least one of the various embodiments, these schedules may be configured to schedule team members, rotating which team member is active (“on-call”). In at least one of the various embodiments, these may be employed to determine which resource is responsible to respond and/or resolve incidents that may be reported and/or detected. In at least one of the various embodiments, if a team member is determined to be the on-call or responsible team member, the notification engine may determine the methods for notify the responsible of the incidents. Schedules previews may be updated in real-time as the schedule is edited. | 06-26-2014 |
20140278667 | REALTIME SCHEDULE MANAGEMENT INTERFACE - Embodiments are directed towards generating and managing schedules. In at least one of the various embodiments, these schedules may be configured to schedule team members, rotating which team member is active (“on-call”). In at least one of the various embodiments, these may be employed to determine which resource is responsible to respond and/or resolve incidents that may be reported and/or detected. In at least one of the various embodiments, if a team member is determined to be the on-call or responsible team member, the notification engine may determine the methods for notify die responsible of the incidents. Schedules previews may be updated in real-time as the schedule is edited. | 09-18-2014 |
John Gary Ryan Laban, Vancouver CA
Patent application number | Description | Published |
---|---|---|
20140180748 | SCHEDULE MANAGEMENT INTERFACE - Embodiments are directed towards generating schedules for managing team members that may be responsible to be on-call for responding to incidents. Schedules may be configured to schedule team members and manage the rotation of one or more team members assigned to one or more schedule layers. Also, schedules may be employed to determine which team member may be responsible to respond and/or resolve incidents that may be reported and/or detected. If a team member is determined to be the on-call or responsible team member, a notification engine may determine the methods for notify the responsible of the incidents. Further, the notification engine may monitor whether the responsible team has received the notification. The notification engine may employ one or more other notification methods to ensure that the responsible team member may be notified. | 06-26-2014 |