Patent application number | Description | Published |
20080308281 | CONTROL LINE RUNNING SYSTEM - A control line running system includes a control line storage unit and a guiding system having a guiding device and a guide rail for guiding a control line from the control line storage unit toward a well center. The system may also include a control line manipulator assembly for moving the control line toward a tubular and a control line clamp for attaching the control line to the tubular. | 12-18-2008 |
20090110535 | REMOTELY OPERATED SINGLE JOINT ELEVATOR - A remotely operated joint elevator for use in handling a tubular is provided. The single joint elevator including a housing having an access opening configured to receive the tubular. The single joint elevator further including at least one closure member connected to the housing via a hinge pin. Additionally, the single joint elevator including a power assembly configured to rotate at least one closure member around the hinge pin to selectively open and close the access opening. In another aspect, a method of handling a tubular using a remotely operated joint elevator is provided. In yet a further aspect, a remotely operated joint elevator for use in handling a tubular. | 04-30-2009 |
20090151934 | TOP DRIVE SYSTEM - In one embodiment, a top drive system includes a quill; a motor operable to rotate the quill; a gripper operable to engage a joint of casing; a connector bi-directionally rotationally coupled to the quill and the gripper and longitudinally coupled to the gripper; and a compensator longitudinally coupled to the quill and the connector. The compensator is operable to allow relative longitudinal movement between the connector and the quill. | 06-18-2009 |
20090245996 | STAND COMPENSATOR - Methods and apparatus for connecting a tubular to a tubular string are provided. In one embodiment, an apparatus suitable for engaging, compensating, and connecting a tubular includes one or more compensating pistons, an engaging assembly for engaging a tubular, and a connector for connecting the engaging assembly to the one or more compensating pistons while allowing for rotation of the tubular relative to the compensation pistons. | 10-01-2009 |
20090255683 | LANDING STRING COMPENSATOR - The present invention generally relates to an apparatus and method for compensating a landing string due to movement of a floating rig platform. In one aspect, a compensation system for use with a landing string is provided. The compensation system includes a slip joint member attachable to the landing string, the slip joint member having an upper portion and a lower portion. The compensation system further includes a first lock assembly configured to connect the upper portion of the slip joint member to a floating rig. Additionally, the compensation system includes a second lock assembly configured to connect the lower portion of the slip joint member to a riser disposed below the floating rig. In another aspect, a method for compensating a landing string due to movement of a floating rig is provided. | 10-15-2009 |
20100059231 | METHODS AND APPARATUS FOR SUPPORTING TUBULARS - Embodiments of the invention relate to a gripping apparatus for supporting a tubular. The gripping apparatus may include a housing, a slip assembly disposed in the housing, and a leveling ring operable to move the slip assembly in the housing. The gripping apparatus may further include a guide member and a mating member operable to couple the slip assembly to the leveling ring. The longitudinal movement of the leveling ring directs the mating member along the guide member to radially displace the slip assembly relative to the housing. | 03-11-2010 |
20100108330 | EQUALIZED LOAD DISTRIBUTION SLIPS FOR SPIDER AND ELEVATOR - Embodiments of the present invention generally relate to an apparatus for supporting a tubular that more evenly distributes stress along the contact length of a tubular. In one embodiment, an apparatus for supporting a tubular is provided. The apparatus includes a bowl having a longitudinal opening extending therethrough and an inner surface for receiving a gripping member. The gripping member is movable along the surface of the bowl for engaging the tubular. The apparatus is configured so that an upper portion of the gripping member will engage the tubular before the rest of the gripping member engages the tubular. | 05-06-2010 |
20100212915 | PIPE HANDLING SYSTEM - The present invention generally relates to a pipe handling system for use with a tubular joining system (such as a welding or forging assembly) located on a drilling rig at a wellbore. In one aspect, a method of forming a string of pipe using a joining assembly at a wellbore is provided. The joining assembly includes an internal joining tool and an external joining tool. The method includes the step of picking up the pipe joint using an elevator. The method further includes the step of positioning a lower end of the pipe joint adjacent an end of a string of pipe disposed in the external joining tool. The method also includes the step of moving the internal joining tool from a first position to a second position relative to the elevator, wherein the second position is between the pipe joint and the string of pipe. The method further includes the step of forming a connection between the pipe joint and the string of pipe. The method further includes the step of gripping the pipe joint with a gripping tool and releasing the elevator from the pipe joint. Additionally, the method includes the step of lowering the pipe joint and the string of pipe into the wellbore. In another aspect, a method of forming a string of pipe using a joining assembly on a rig is provided. In a further aspect, a pipe handling system for locating a pipe joint in a joining assembly that includes an internal joining tool and an external joining tool is provided. | 08-26-2010 |
20100243273 | TORQUE SUB FOR USE WITH TOP DRIVE - A torque sub for use with a top drive is disclosed. A method of connecting threaded tubular members for use in a wellbore includes operating a top drive. The top drive rotates a first threaded tubular member relative to a second threaded tubular member. The method further includes measuring a torque exerted on the first tubular member by the top drive. The torque is measured using a torque shaft rotationally coupled to the top drive and the first tubular. The torque shaft has a strain gage disposed thereon. The method further includes wirelessly transmitting the measured torque from the torque shaft to a stationary interface; measuring rotation of the first tubular member; compensating the rotation measurement by subtracting a deflection of the top drive and/or the first tubular member; determining acceptability of the threaded connection; and stopping rotation of the first threaded member when the threaded connection is complete or if the threaded connection is unacceptable. | 09-30-2010 |
20110174483 | APPARATUS FOR GRIPPING A TUBULAR ON A DRILLING RIG - Methods and apparatus are provided for running tubulars into and out of a wellbore. A tubular handling system having a tubular gripping apparatus having a gripping mechanism and a sensor adapted to track movement of the gripping mechanism, wherein the sensor sends a signal to a controller when the gripping apparatus is in a position that corresponds to the gripping apparatus being engaged with the tubular | 07-21-2011 |
20110253390 | CONTROL LINE RUNNING SYSTEM - A control line running system includes a control line storage unit and a guiding system having a guiding device and a guide rail for guiding a control line from the control line storage unit toward a well center. The system may also include a control line manipulator assembly for moving the control line toward a tubular and a control line clamp for attaching the control line to the tubular. | 10-20-2011 |
20110290499 | DEEPWATER COMPLETION INSTALLATION AND INTERVENTION SYSTEM - Methods and apparatus for installing deepwater completions and performing well intervention from a vessel that can perform other duties while not running completions or performing interventions. The system for installing deepwater completions and performing well intervention may comprise a surface pipe handling and deployment package including a horizontally operated rig that may also be operated in a slanted mode. Deepwater completions may be deployed from the vessel via a buoyant horizontal riser (BHR), which may be supported by a submerged buoyant tensioning system (BTS). In this manner, the cost of performing completion or intervention operations may be significantly reduced compared to such operations run from a drilling rig. | 12-01-2011 |
20120031628 | TORQUE SUB FOR USE WITH TOP DRIVE - A torque sub for use with a top drive is disclosed. A method of connecting threaded tubular members for use in a wellbore includes operating a top drive. The top drive rotates a first threaded tubular member relative to a second threaded tubular member. The method further includes measuring a torque exerted on the first tubular member by the top drive. The torque is measured using a torque shaft rotationally coupled to the top drive and the first tubular. The torque shaft has a strain gage disposed thereon. The method further includes wirelessly transmitting the measured torque from the torque shaft to a stationary interface; measuring rotation of the first tubular member; compensating the rotation measurement by subtracting a deflection of the top drive and/or the first tubular member; determining acceptability of the threaded connection; and stopping rotation of the first threaded member when the threaded connection is complete or if the threaded connection is unacceptable. | 02-09-2012 |
20120152530 | ELECTRONIC CONTROL SYSTEM FOR A TUBULAR HANDLING TOOL - An electronic control system comprises a first tubular handling tool, a sensor, and a controller. The controller is configured to control actuation of the first tubular handling tool in response to an electronic signal received from the sensor that corresponds to an operational characteristic of the first tubular handling tool. The electronic control system functions as an electronic interlock system to prevent mishandling of a tubular. A method of controlling a tubular handling tool comprises measuring an operational characteristic of the tubular handling tool, communicating the operational characteristic to a controller in the form of an electronic signal, and using the controller to control actuation of the tubular handling tool in response to the measured operational characteristic. | 06-21-2012 |
20120211217 | CONTROL LINE RUNNING SYSTEM - A control line running system includes a control line storage unit and a guiding system having a guiding device and a guide rail for guiding a control line from the control line storage unit toward a well center. The system may also include a control line manipulator assembly for moving the control line toward a tubular and a control line clamp for attaching the control line to the tubular. | 08-23-2012 |
20120211244 | TOP DRIVE SYSTEM - In one embodiment, a top drive system includes a quill; a motor operable to rotate the quill; a gripper operable to engage a joint of casing; a connector bi-directionally rotationally coupled to the quill and the gripper and longitudinally coupled to the gripper; and a compensator longitudinally coupled to the quill and the connector. The compensator is operable to allow relative longitudinal movement between the connector and the quill. | 08-23-2012 |
20120247786 | REMOTELY OPERATED SINGLE JOINT ELEVATOR - A remotely operated joint elevator for use in handling a tubular is provided. The single joint elevator including a housing having an access opening configured to receive the tubular. The single joint elevator further including at least one closure member connected to the housing via a hinge pin. Additionally, the single joint elevator including a power assembly configured to rotate at least one closure member around the hinge pin to selectively open and close the access opening. In another aspect, a method of handling a tubular using a remotely operated joint elevator is provided. In yet a further aspect, a remotely operated joint elevator for use in handling a tubular. | 10-04-2012 |
20140048248 | CONTROL LINE RUNNING SYSTEM - A control line running system includes a control line storage unit and a guiding system having a guiding device and a guide rail for guiding a control line from the control line storage unit toward a well center. The system may also include a control line manipulator assembly for moving the control line toward a tubular and a control line clamp for attaching the control line to the tubular. | 02-20-2014 |
20140090856 | COMPENSATING BAILS - A pipe handler for assembling and deploying a string of threaded tubulars into a wellbore includes a pair of compensating bails and an elevator pivotally connected to the compensating bails. Each compensating bail includes: a first bail segment; a second bail segment; and a compensator connecting the respective first and second bail segments. Each compensator includes a load cylinder connected to the respective first bail segment and a linear actuator disposed in the respective load cylinder and operable to retract the respective second bail segment from a hoisting position to a ready position. Each second bail segment is engaged with the respective load cylinder in the hoisting position. The compensating bails are capable of supporting string weight in the hoisting position. | 04-03-2014 |
20140116686 | APPARATUS FOR GRIPPING A TUBULAR ON A DRILLING RIG - Methods and apparatus are provided for running tubulars into and out of a wellbore. A tubular handling system having a tubular gripping apparatus having a gripping mechanism and a sensor adapted to track movement of the gripping mechanism, wherein the sensor sends a signal to a controller when the gripping apparatus is in a position that corresponds to the gripping apparatus being engaged with the tubular | 05-01-2014 |
20140131051 | METHOD AND APPARATUS FOR HANDLING A TUBULAR - A method of running tubulars includes attaching a load collar to a first tubular; landing the load collar on a load support member; connecting a second tubular to the first tubular; removing the load collar from the first tubular; and lowering the first tubular and the second tubular. In one embodiment, at least one of the first tubular and the second tubular is a screen. | 05-15-2014 |
20140262526 | TUBULAR HANDLING APPARATUS - In one embodiment, a tubular handling assembly for use with a top drive includes a mandrel coupled to the top drive; a gripping assembly for gripping and releasing a tubular, the gripping assembly coupled to and rotating with the mandrel; and an actuation assembly for actuating the gripping assembly, wherein the gripping assembly is rotatable relative to the actuation assembly. | 09-18-2014 |
20140326467 | TUBULAR HANDLING TOOL - Embodiments of the invention generally relate to a tubular handling tool. The tool may include a base and a ring or sleeve member. The tool may further include an actuation member configured to move or rotate the ring or sleeve member relative to the base. Additionally, the tool may include a clamp or dog member attached to the base. The clamp or dog member is configured to move between a radially retracted position and a radially extended position as the ring or sleeve member moves or rotates relative to the base. | 11-06-2014 |
20140326468 | METHOD OF USING A TOP DRIVE SYSTEM - In one embodiment, a top drive system includes a quill; a motor operable to rotate the quill; a gripper operable to engage a joint of casing; a connector bi-directionally rotationally coupled to the quill and the gripper and longitudinally coupled to the gripper; and a compensator longitudinally coupled to the quill and the connector. The compensator is operable to allow relative longitudinal movement between the connector and the quill. | 11-06-2014 |
20140338917 | LANDING STRING COMPENSATOR - Apparatus and methods for compensating a landing string due to movement of a floating rig platform are provided. In one aspect, a compensation system for use with a landing string is provided. The compensation system includes a slip joint member attachable to the landing string, the slip joint member having an upper portion and a lower portion. The compensation system further includes a first lock assembly configured to connect the upper portion of the slip joint member to a floating rig. Additionally, the compensation system includes a second lock assembly configured to connect the lower portion of the slip joint member to a riser disposed below the floating rig. In another aspect, a method for compensating a landing string due to movement of a floating rig is provided. | 11-20-2014 |
20150053424 | FILL UP TOOL - A fill up tool includes a mandrel; a primary sealing member disposed around the mandrel; and a selectively operable secondary sealing member activated by rotation of the mandrel. In another embodiment, the selectively operable secondary sealing member is activated using hydraulic pressure. | 02-26-2015 |
20150060045 | PIPE HANDLING SYSTEM - A pipe handling system for locating a pipe joint in a joining assembly that includes an internal joining tool and an external joining tool is provided. The system includes a gripper configured to grip a surface of the pipe joint; an elevator configured to pick up the pipe joint and position the pipe joint adjacent a string of pipe disposed in the external joining tool; and a deployment assembly coupled to the gripper, wherein the deployment assembly includes a cable that is used to position the internal joining tool inside the pipe joint. | 03-05-2015 |