Casting in situ hardenable fluent material

Subclass of:

405 - Hydraulic and earth engineering

405229000 - FOUNDATION

405231000 - Columnar structure (e.g., pier, pile)

405232000 - Process or apparatus for installing

Patent class list (only not empty are listed)

Deeper subclasses:

Class / Patent application numberDescriptionNumber of patent applications / Date published
405233000 Casting in situ hardenable fluent material 57
20080232906Pile anchor foundation - A circular concrete cap foundation poured in-situ within a perimeter forming corrugated metal pipe set atop or within an excavated pit and enclosing a series of circumferentially spaced pile anchors. The circular concrete cap foundation supports sets of inner and outer circumferentially spaced tower anchor bolts having their lower ends anchored to an embedded anchor ring and their upper ends projecting vertically and upwardly out the top of the circular foundation to engage the base flange of a supported tower. The pile anchors are formed with perimeter corrugated metal pipes set deep in subsurface soils with cementitious material surrounding and partially bonding to a centralized steel bolt or tendon which extends through the cap foundation. The tower anchor bolts and the pile anchor bolts are both partially encased in a PVC sleeve so that the bolts can be post-tensioned. The pile anchors are in tension only and serve to pull the cap foundation down to compress the underlying ground soils.09-25-2008
20080253845Building foundation structure formed with soil improving body and raft foundation and construction method for soil improvement and raft foundation - To provide building foundation structure formed with a soil improving body and raft foundation that can suppress weight increase of a soil improving body while achieving suppression of differential settlement and improvement of bearing capacity of the whole foundation and that can be applied to medium-rise buildings.10-16-2008
20090202307METHOD OF CONSTRUCTING AN INSULATED SHALLOW PIER FOUNDATION BUILDING - A method of constructing a shallow pier foundation building that includes a) placing a plurality of insulating pier forms along a perimeter of the building; b) placing a plurality of insulating concrete forms between the insulating piers to form a continuous insulating surface to the surrounding soil and a continuous forming surface to provide a slab form; c) placing a concrete composition in the insulating piers and insulating concrete forms and allowing the concrete composition to cure and harden; and d) placing a concrete slab composition in the slab form and allowing the concrete composition to cure and harden.08-13-2009
20090269146Method for Construction of Piles and Caissons and Soil Improvement by Using Rubber Hoses - Method for construction of piles or caissons, which consists of drilling i.e. augering a borehole, deformating are carried by means of a neoprene or rubber hose or by means of a head unit for expansion. When connected with the pressure generator (10-29-2009
20090279960Device and Method for Improved Pile Casting - This invention deals with a device and a method for an improved concrete pile casting in swelling soils by substantially lowering or eliminating heave forces created in active soils from affecting said piles by surrounding selectable parts of the pile by an easily deformable material for lowering the horizontal and the vertical soil movement effect, and by providing a low friction surface for further lowering vertical forces effect. This inventive device and method further facilitates subsequent operations by permitting an easy and seamless casting of columns and by ensuring a clean and smooth pile surface for a better adhesion of new concrete to an old one, as well as preventing cement dough seepage to surrounding soil and concrete segregation.11-12-2009
20090317194Drilling rig and drilling method - The invention relates to a drilling rig and a drilling method, in which the drilling element is caused to rotate and is displaced along a mast by means of a drilling drive, which drilling element has a continuous screw auger disposed below the drilling drive, and an extension, which is connected to the continuous screw auger and extends upwardly through the drilling drive. According to the present invention, a displacement head is disposed between the continuous screw auger and the extension and is adapted to force earth material into the wall of a bore hole.12-24-2009
20100054864AUGER GROUTED DISPLACEMENT PILE - Disclosed in this specification is a method and apparatus for placing a helical pile in the soil with minimal disturbances to the soil. The helical pile has an elongated pipe with a central chamber. The pipe has a helical blade with an opening in the trailing edge of the blade where grout is extruded. The grout fills those portions of the soil which were disturbed by the blade. Advantageously, those portions of the soil which were not disturbed by the blade are not infused with grout.03-04-2010
20100247245FOUNDATION STRUCTURE USING MICRO PILE AND METHOD FOR FORMING THE SAME - A foundation structure using a micro pile and a method of forming the same. A cover steel plate is disposed at an upper end of the micro pile, and has a micro pile hole. The micro pile is connected with others in series thanks to the use of two through eight protrusions formed on a lower end thereof. Grout or concrete is injected into a hollow channel of the micro pile, and enhances a conglomerating force between the micro pile and the ground abutting the micro pile to thereby strengthen the force supporting the ground in the vertical and horizontal directions.09-30-2010
20100329797Modified Storage Pod and Feeding System for Binder Utilized for In-Situ Pilings and Method of Utilizing the Same - In a vessel utilized for providing powdered materials, such as binder, for the construction of an in-situ piling, the vessel has a binder feeding system having a fluidization chamber, where the fluidization chamber receives air at a higher pressure than the substantial portion of the remainder of the vessel. This higher pressure enhances the fluidization of the powered materials as the materials are dispersed through an actuated valve at the bottom of the vessel. This system results in a decreased volume of air required for transporting the powdered materials through the feeder hose to the tool in the piling borehole, thereby reducing the creation of air pockets in the in-situ piling. This feeder system replaces the cell wheel currently used in binder feeder systems.12-30-2010
20110052330Method and Apparatus for Making an Expanded Base Pier - A system for constructing a support column includes a mandrel with an upper portion and a tamper head. A feed tube extends through the mandrel for feeding flowable material to the head. The tamper head includes a lower enlarged chamber with a reducing surface at an upper portion for compacting material and restricting upward flow of aggregate. The tamper head is of a size providing an enclosed region for allowing cementitious materials to be placed therein. The system allows a support column including a cementitious inclusion on top of an expanded base to be built.03-03-2011
20110070033EQUIPMENT AND METHOD FOR CONSTRUCTING MICROPILES IN SOIL, IN PARTICULAR FOR THE ANCHORAGE OF ACTIVE ANCHORS - An equipment for constructing micropiles in soil, includes a drilling rod with a bit with at least one nozzle jetting fluid forward, and at least one nozzle jetting fluid substantially orthogonal; an element pulling a protective tube, not adhering to the rod. A corresponding method includes drilling with a drilling rod jetting liquid in front of the bit until reaching stable soil strata; drilling and injecting high-pressure grout with one or more lateral nozzles, while the drilling rod rotates; pulling the protective tube, the tube being inserted to the area of grout injection; when the required depth is reached, the proximal end of the drilling rod is anchored to a plate; when the grout is consolidated, traction is applied to the drilling rod if necessary. Grout is injected into the protective tube.03-24-2011
20110135401GROUTED PILE SPLICE AND METHOD OF FORMING A GROUTED PILE SPLICE - The grouted pile splice for pipe piles includes a lower pile section, and an upper pile section including an integral driving portion adapted to apply a driving force to the lower pile section. The upper pile section includes a stabbing portion sized to extend through a proximal end opening and into an inner bore of the lower pile section to form an annulus space between the upper pile section and the lower pile section to receive grout. The driving portion may include a wall thickness greater than a wall thickness of the stabbing portion, and an annular land positioned to contact a proximal end of the lower pile section. A grout distributor assembly may be mounted in the upper pile section to receive grout. A grout line assembly is inserted into the upper pile section and mated with the distributor assembly to supply pumped grout to the annulus space. A method and upper pile section are also provided.06-09-2011
20120039671Apparatus For High Capacity Stone Delivery With Concentric Flow and Enhanced Nosecone For Soil Improvement - An apparatus for forming a column of compacted material in soil to increase load bearing capabilities and to provide drainage through a system having: a hopper, a stone chamber, a transition splitter pipe having at least two outlet chutes, a vibratory probe mechanism having a tip, a nosecone, and a control system; the vibratory probe mechanism has same number of chutes as the transition splitter pipe; the additional chutes are positioned along the side of the vibratory probe mechanism to increasing the flow rate of a material being discharged into a soil; the hopper is connected to the stone chamber which in turn is connected to the transition splitter pipe, the transition splitter pipe has chutes that are connected to the chutes of the vibratory probe mechanism, wherein the vibratory probe mechanism is connected to the nosecone; the control system constantly monitors the pressure of the air in the system to ensure that the chutes continuously and uniformly discharge the material; wherein the control system has one or more valves, and one or more sensors, which are interlocked together to create a pressurized air system which is necessary in order to assist the material to travel down the pipes and into the chutes and out at the tip of the vibratory probe mechanism.02-16-2012
20120301227FOUNDATION PILE AND INSTALLING METHOD THEREOF - A foundation pile includes a tubular wall, a top cap covering a top end of the tubular wall, a partition plate disposed transversely in the tubular wall below the top cap and dividing an inner space of the tubular wall into upper and lower spaces, two opposite fixing holes extending radially through the tubular wall and communicated with the upper space, and a plurality of pressure release holes extending radially through the tubular wall and communicated with the lower space. The partition plate prevents concrete slurry from flowing into the upper space. The pressure release holes allow the concrete to consolidate therein and to thereby increase transverse binding forces with the foundation pile. A method of installing the foundation pile is also disclosed.11-29-2012
20120308309MANUFACTURING METHOD, DRIVING IN AND INJECTION OF UNDERWATER PILES - Manufacturing, driving and injection method of underwater piles that serve as a foundation for any structure or platform in which one starts with a pillar or pipe (12-06-2012
20120328374Seismic Restraint Helical Pile Systems and Method and Apparatus for Forming Same - A reinforced helical pile system suitable for use in seismically active areas incorporates steel fibers in the grout and a fiber reinforced polymer sleeve (casing). A low-friction driving assembly and low-friction sleeve couplings enable the sleeve to be drawn into the soil substantially without rotation, reducing power consumption and preserving the integrity of the casing.12-27-2012
20120328375ANCHORING SYSTEM AND METHOD - An anchoring system and method according to which a tubular member is positioned in a subterranean substrate and a conglomerate is formed within the subterranean substrate, the conglomerate including respective portions of the subterranean substrate and a chemical fastener in a cured state. The conglomerate is adhered to the tubular member. To form the conglomerate, the chemical fastener in a liquid state is injected into an internal passage defined by the tubular member so that the chemical fastener flows from the internal passage and into the subterranean substrate via at least a first radial opening formed in the first tubular member.12-27-2012
20130004243APPARATUS AND METHODS FOR PILE PLACEMENT - Assemblies for improving the installation of pilings into the ground are disclosed. The assemblies may include a modified pipe pile and a removable point inserted into the end of the pile. Methods of using the assemblies in the installation of pipe piling into the ground are also disclosed.01-03-2013
20130011204METHOD AND APPARATUS FOR FORMING PILINGS AND ANCHORS - Pile forming includes providing an anchor having a shaft with a major axis, a bit fixed at one end, and a stop releasably coupled to the shaft. A casing having a major axis, is co-axially aligned with the major axis of the shaft, between the bit and the stop. A centralizer maintains separation between the shaft and casing, creating a region therebetween. The anchor is placed in soil, ground or substrate, the shaft turned and pressure applied to advance the anchor, forcing material out of a region surrounding the shaft. The stop is decoupled from the shaft. The shaft is continually turned and pressure applied to further advance the anchor. A fluid grout is flowed into said region surrounding the shaft and into the region between shaft and the casing. The turning and application of pressure are stopped, and the fluid grout allowed to solidify.01-10-2013
20130051927POST TENSIONED FOUNDATIONS, APPARATUS AND ASSOCIATED METHODS - Described herein are shallow post tensioned foundation systems for mounting light to medium weight structures. Methods of installation are also described. The systems, apparatus and methods described can reduce waste, increase efficiency and reduce cost and installation/construction time.02-28-2013
20130243533Method for Installing a Helical Pier with Polyurthane Resin Grout - A method for installing a helical pier using a polyurethane resin grout that results in a support structure capable of bearing heavy loads and exhibiting high lateral strength which is also nontoxic and non-hazardous to the environment09-19-2013
20130272798APPARATUS AND METHODS FOR THE PLACEMENT OF PIPE PILING - Apparatus and methods for the installation of pipe pilings into the ground for use as structural building foundations, geothermal piles, or both, are disclosed. In addition to specialized fittings for pipe pile assemblies, the inventions include specialized drive mechanisms used in conjunction with rotary or vibratory motors. Methods of installing pipe pilings are further improved with the disclosure of methods of adding grout or similar materials during or after installation of the piles.10-17-2013
20130272799APPARATUS AND METHODS FOR PIPE PILING PLACEMENT WITH CONTINUOUS GROUTING - A pipe assembly may have one or more pipe segments that are coupled together or coupled to a drive socket by a coupler. The bottom-most pipe segment being a bottom pile segment that may have a body with a central axis, an exterior surface an upper end connectable to the pipe pile assembly, and a bottom end, the bottom end inhibiting grout from passing through the bottom end, helical flights extending from the exterior surface of the body substantially perpendicular to the central axis, and grout ports through which the grout is emittable. The bottom pipe segment is designed to receive grout introduced through the pipe assembly so that the grout can be emitted the grout ports during the driving of the pile assembly into soil. The emitted grout forms a grout/soil mixture jacket within the disturbed soil along an exterior of the pipe pile assembly which adds appreciably to the overall stability, and particularly the lateral stability, of the pipe pile column created.10-17-2013
20130343823Pile with Grout Vortex - A pile is provided for installation into earth, comprising, a shaft that includes a shaft axis, a plurality of helices, and a metal that is capable of being welded so as to securely attach the helices; the shaft is provided with an end that has been configured for successive piling; the helices are shaped so that, when the shaft is torqued, the helices screw the pile into the earth about the shaft axis; a bladed portion provide with a shaft-accommodating section, a pile securing structure, a collar, and a blade; the shaft-accommodating section of the bladed portion is shaped according to the end of the shaft; the pile securing structure is configured to cooperate with a fastener; the collar of the bladed portion is generally concentric about the shaft axis; and the blade is shaped, at least in part, to agitate grout.12-26-2013
20140003868Method and Apparatus for Casting a Concrete Pile in the Ground01-02-2014
20140017015METHOD AND ARRANGEMENT FOR SUPPORTING STRUCTURE - Method and arrangement for supporting a structure. Beneath the structure there is arranged a cohesion structure, which transfers the structure load through shaft adhesion to surrounding ground (01-16-2014
20140086692DEVICE AND METHOD FOR INTRODUCING A FILLING MATERIAL - The invention relates to a device for introducing a filling material into a hole in the ground, with a channel-like filling means which can be introduced into the hole and has an upper feed opening for feeding in the filling material and a lower discharge opening for discharging the filling material in a lower area of the hole. The filling means comprises an upper feed section and a flexible hose section arranged below. During the filling of the hole with the filling material the flexible hose section can be moved upwards along the feed section. During upward movement of the flexible hose section a severing means severs an upper area of the hose section in a longitudinal direction. Furthermore, the invention relates to a method for introducing a filling material into a hole.03-27-2014
20140105689GROUT PLUG ASSEMBLY TO FACILITATE GROUTING DURING PIPE PILING PLACEMENT - A grouting assembly receives grout and delivers the grout to a pipe assembly for delivery to underground soil. The grouting assembly may have a drive shaft assembly with a rotary output shaft and a drive socket, a grout tube, a drivable coupler, and a grout plug assembly. The grout plug assembly inserts into the drivable coupler and accepts the grout tube in sealed engagement. The rotary output shaft, grout tube, and grout plug assembly define a conduit that provides an unobstructed flow path for the grout into the pipe assembly. The bottom-most pipe segment of the pipe assembly is designed to receive grout introduced through the pipe assembly so that the grout can be emitted through grout ports during the driving of the pile assembly into soil. The emitted grout forms a grout/soil mixture jacket within the disturbed soil along an exterior of the pipe pile assembly which adds appreciably to the overall stability, and particularly the lateral stability, of the pipe pile column created.04-17-2014
20140314496Polymer grouting method for constructing multi-wing pile - A polymer grouting method for constructing multi-wing pile, includes steps of: (1) arranging the positions of piles; (2) producing multi-wing drilling tool and locating holes; (3) installing grouting pipes; (4) polymer lifting grouting; (5) forming polymer multi-wing piles. According to the geologic characteristics, the three-wing drilling tool or the four-wing drilling tool are produced through pressing the drilling tool into each location of pile by a static pressure equipment to form the multi-wing holes, and injecting two-component expansive polymer materials to the holes, wherein the polymers expand and solidify after reacting for filling the holes and the gaps in the soil of slope to be fully integrated with the surrounding soil and form the polymer multi-wing piles.10-23-2014
20150023739DRIVE POINT FOR A PILE - The invention relates to a drive point for a substantially tubular, in particular hollow cylindrical, driven pile having a pile core through which concrete can be introduced into the driven pile, wherein the drive point can be fitted onto one end of the driven pile, wherein at least one first supporting web with a first contact surface for an end face of the pile end is arranged on an inner wall of the drive point, wherein starting from the plane of the first bearing surface the drive point has a cavity which extends at least partially in the driving direction and into which concrete can be introduced through the pile core when the driven pile is fitted, wherein at least one concrete outlet channel is provided which connects the cavity to an upper edge of the drive point.01-22-2015
20150117959COLLAR FOR MARINE PILE REPAIR AND METHOD OF USING SAME - A collar for repairing a marine support has a tubular upper segment, a tubular lower segment, and a middle segment providing a transition region between the upper and lower segments. The collar can be opened and closed along a slit extending from the upper end of the collar to the lower end of the collar. To repair a marine support, the collar is opened and positioned so as to surround the marine pile and the extension. The collar is then closed and secured along the slit. The upper end of the collar is secured to the extension, and the lower end of the collar is secured closely along the perimeter of the pile. A flowable fill material is then injected into spaces between the collar and the marine support, filling or encasing voids or damaged areas on the marine support.04-30-2015
20150345095APPARATUS AND METHODS FOR THE PLACEMENT OF PIPE PILING - Apparatus and methods for the installation of pipe pilings into the ground for use as structural building foundations, geothermal piles, or both, are disclosed. In addition to specialized fittings for pipe pile assemblies, the inventions include specialized drive mechanisms used in conjunction with rotary or vibratory motors. Methods of installing pipe pilings are further improved with the disclosure of methods of adding grout or similar materials during or after installation of the piles.12-03-2015
20160002874CONNECTION BETWEEN A FOUNDATION PILE OF A STRUCTURE AND AN IN PARTICULAR TUBULAR TRANSITION PIECE, AND METHOD FOR PRODUCING SAME - The invention relates to a connection between a foundation pile of a construction, in particular of an onshore or offshore construction, for example an onshore or offshore wind energy plant, having an in particular tubular transition piece, wherein the foundation pile and the transition piece are fitted one over the other or plugged one into the other with an intermediate space in between, and the intermediate space is at least partially filled with a mortar or concrete which has high strength after hardening, and to a method for producing same.01-07-2016
20160032549METHOD AND SYSTEM TO MANUFACTURE NATIVE SOIL FLOWABLE FILL - A method to manufacture native soil flowable fill includes hydro excavating native soil to form a hole at a first excavation, and transferring the native soil from the first excavation to a mixing tank. The method also includes adding a pozzolan component, cement and water to the mixing tank, mixing the native soil in the mixing tank with the added pozzolan component, cement and water to form the native soil flowable fill, and transferring the native soil flowable fill back to the first excavation and into the hole.02-04-2016
20160083927CLEANING DEVICE FOR CLEANING A BOTTOM OF A BOREHOLE AND METHOD FOR CREATING A FOUNDATION ELEMENT - The invention relates to a cleaning device for cleaning a bottom of a borehole in the ground and also to a method for creating a bored pile in a borehole. The cleaning device has a pumping means, through which sedimented ground material in the region of the bottom of the borehole can be sucked away via a suction opening and can be discharged from the borehole via a suction line. At least one flushing nozzle is provided, through which a flushing jet can be produced, which exits the cleaning device and flushes sedimented ground material from the bottom of the borehole. A bored pile can then be produced in a thus cleaned borehole.03-24-2016
405234000 With heating, cooling, or explosion 2
20100067990SEVERING DEVICE WITH CONTROLLED TRIGGERING - Device for severing parts of a concrete work, comprising a container in which an over-pressure is generated by a gas produced by a chemical reaction between a chemical compound and an aqueous solution after a predetermined delay. The container includes the aqueous solution and is attached to a case comprising a first recess for storing the chemical compound. A burst disk is arranged between the first recess and the container for ensuring a total sealing between the chemical compound and the aqueous solution. The case includes a second recess enclosing an electronic trigger, an actuator being controlled by the trigger to cause bursting of the burst disk after a predetermined delay, causing said chemical reaction inside the container.03-18-2010
20150361633PRE-STRESS CORROSION-RESISTANT TUBULAR PILE USED IN SPECIAL COASTAL GEOLOGICAL CONDITIONS AND MANUFACTURING METHOD - A pre-stress corrosion-resistant tubular pile used in special coastal geological conditions and manufacturing method thereof is disclosed. The raw materials and proportions of the pre-stress corrosion-resistant tubular pile are as follows: 350-450 parts by weight of cement; 90-135 parts by weight of an ore powder; 600-700 parts by weight of sand; 100-120 parts by weight of stones; water and a water reducing agent; wherein the cement and ore powder are gels; the weight ratio of water to the gels is 0.30-0.31, and the mass ratio of the water reducing agent to the gels is (1.8-2.2):100.12-17-2015
405235000 With subsequent moving 2
20120014755METHOD FOR PLACING A PILE OR ANCHORING PILE INTO GROUND - Method for placing a concrete-structure load-bearing pile or anchoring pile into the ground, in which method by means of hits generating device (01-19-2012
20160040384PILE CASING - A pile casing comprising a hollow that extends through an entire length of the pile casing, wherein the pile casing is manufactured of a first material selected from the group consisting of a polymer material and a composite material comprising a polymer material and at least one of glass fibers, carbon fibers, steel fibers and wood. A pile comprising such a pile casing and a filling that fills the hollow, wherein the filling comprises at least one material selected from the group consisting of sand, gravel, concrete, wood, glass, glass fibers, metal, carbon fibers, steel fibers, basalt fibers, asphalt, asphalt concrete, and a composite comprising at least one material selected from the group consisting of sand, gravel, concrete, wood, glass, glass fibers, metal, carbon fibers, steel fibers, basalt fibers, asphalt and asphalt concrete.02-11-2016
405237000 Forming subsurface enlargement 3
20100178115Systems and Methods for Securing Foundation Members in a Substrate - Systems and methods are provided for establishing and securing a foundation in a substrate. For example, in one embodiment, a pump conveys a first fluid (e.g., water) through a pile member to produce an elongate opening in a substrate, which allows the pile member to be advanced into the substrate. After the pile member has been advanced into the elongate opening in the substrate, a second fluid (e.g., fluidized concrete) is conveyed out of openings on the side (and the bottom) of the pile member to substantially secure the pile member in the elongate opening defined in the substrate.07-15-2010
20100232887BREAKAWAY CASING CONNECTION - A temporary casing is disclosed. The casing includes a primary portion capable of being driven into the ground and comprising a hollow portion wherein soil may be removed from within the primary casing portion, a detachable portion, also being capable of being driven into the ground and comprising a hollow portion wherein soil may be removed from within the detachable portion, a connection means for connecting the primary casing to the detachable portion such that the connection means enables the transfer of the driving force applied to the primary casing portion to the detachable portion in order to drive the detachable portion into the ground in association with the primary casing portion, wherein the connection means causes the detachable portion to detach from the primary portion when a threshold force is applied to the connection means and allows retrieval of at least the primary portion.09-16-2010
20160097177MACHINE AND A METHOD FOR MAKING COLUMNS IN GROUND - The invention relates to a machine (04-07-2016
405239000 Providing embedded metallic reinforcement 4
20080304918REINFORCED-CONCRETE COLUMN IN THE SOIL PIT AND METHOD OF ITS CONSTRUCTION - A reinforced-concrete column contains reinforcing cage and inserts made monolithic with concrete mix and comprises the upper bearing and lower foundation parts. The method of construction of the column includes operations of manufacture of the column reinforcing cage with inserts, placement of concrete in the non-removable casing in the project position in single- or multi-slit pit with the column making monolithic. The column reinforcing cage is loaded vertically into the pit, centered vertically, and the upper part is fixed from horizontal displacements, the lower foundation part of the column and the inner part of the non-removable casing with the closed-type casing in the upper bearing part of the column are made monolithic with concrete from down to top. After making monolithic, the soil base is widened and cemented via the process pipeline placed inside the reinforcing cage; the space between the non-removable casing and the pit walls in the upper bearing part is filled with granular material.12-11-2008
20090169310METHOD OF SPLICING PILE CAGES, SET OF COMPONENTS THEREFOR, AND ASSEMBLED PILE CAGES - This invention relates to a method of splicing pile cages, to a set of components therefor, and to assembled pile cages, and in particular to a method of splicing together two pile cages of a reinforced concrete pile. The method employs two pile cages which are each assembled from a number of cage bars and at least one frame, one of the pile cages having a suspension band adjacent to one of its ends, the other pile cage having at least one support plate adjacent to one of its ends, the support plate having a hole therethrough. One of the pile cages is lifted into a pile hole with its end projecting therefrom, and the second pile cage is lifted over the first pile cage and lowered until a part of the cage bars of the second pile cage overlap a part of the cage bars of the first pile cage, and the hole in the support plate lies below the suspension band. A suspension bolt is inserted through the hole in the support plate so that a part of the suspension bolt lies underneath a part of the suspension band, whereby the first and second pile cages can be lifted together with the suspension bolt engaging the suspension band.07-02-2009
20090214299METHOD AND SYSTEM FOR INSTALLING GEOTHERMAL HEAT EXCHANGERS, MICROPILES, AND ANCHORS USING A SONIC DRILL AND A REMOVABLE OR RETRIEVABLE DRILL BIT - There is provided a method for drilling a cased hole and installing a micropile. A sonic drilling apparatus is positioned at a desired location. The sonic drilling apparatus includes a rotating and vibrating apparatus for rotating and vibrating a drill string into the ground. A retrievable drill bit is operatively connected to the drill string. The cased hole is drilled to a desired depth by rotating and vibrating the drill string into the ground. The retrievable drill bit is retrieved from the cased hole following the drilling of the cased hole to the desired depth. A micropile is lowered into the cased hole following the retrieval of the retrievable drill bit. Grouting material may be discharged into the cased hole before or after the drill string is removed from the ground. In another embodiment, a removable drill bit may be used in place of the retrievable drill bit.08-27-2009
20100124462METHOD AND SYSTEM FOR INSTALLING GEOTHERMAL TRANSFER APPARATUSES WITH A SONIC DRILL - The present invention relates to a method for drilling a hole and installing a geothermal transfer apparatus. A sonic drilling apparatus is positioned at a desired location. The sonic drilling apparatus includes a rotating and vibrating apparatus for rotating and vibrating a hollow drill string into the ground, the hollow drill string having an inner space. The hole is drilled to a desired depth by rotating and vibrating the hollow drill string into the ground while discharging fluid into the inner space of the hollow drill string. A geothermal transfer apparatus is lowered into the inner space of the hollow drill string following the drilling of the hole to the desired depth. The drill string is then removed from the ground.05-20-2010
405240000 Dispensing fluent material while withdrawing dispenser 10
20100028087Shielded Tamper and Method of Use for Making Aggregate Columns - A tamper device includes a shaft for driving a tamper head. A tamper head is attached to the end of the shaft for tamping a lift of aggregate in a cavity formed in a ground surface. A shield extends upwardly a predetermined height from the tamper head an amount sufficient to prevent sidewalls of the cavity from failing and collapsing. Methods of constructing aggregate columns with thicker lifts are also disclosed.02-04-2010
20120163922SHIELDED TAMPER AND METHOD OF USE FOR MAKING AGGREGATE COLUMNS - A tamper device including a shaft for driving a tamper head, and a shield. A tamper head is attached to the end of the shaft for tamping a lift of aggregate in a cavity formed in a ground surface. A shield attached to the tamper device and spaced a predetermined distance above a top surface of the tamper head, the shield having a predetermined length extending upwardly above the tamper head sufficient to prevent sidewalls of a cavity in soft soil in which the tamper device is used from failing and collapsing into the cavity. Methods of constructing aggregate columns with thicker lifts are also disclosed.06-28-2012
20130177359Method and Apparatus for Ground Improvement Using Compacted Aggregate Columns - An apparatus and method for forming compact aggregate columns. The apparatus includes an aggregate materials hopper; a hollow mandrel adapted to be driven into the ground; a plurality of rubber bearing isolators disposed between the mandrel and the hopper for reducing transmission of vibratory energy between the mandrel and the hopper, and a rubber seal encircling and moulded to the outer circumference of the mandrel for preventing aggregate leakage from the hopper; flow control means comprising a stone gate or hinged tip convertible between an open position and a closed position for controlling aggregate flow, one or more collars encircling the mandrel disposed along the length of the mandrel, each collar having an outer circumference greater than the mandrel circumference; a vibratory hammer attached to a vehicle for inserting and removing the mandrel into the ground; and a monitoring and control system in the cab of the vehicle.07-11-2013
20140056651METHOD OF PROVIDING A SUPPORT COLUMN - A primary earth penetrating mandrel formed of a hollow shell steel plate has an upper end and an open lower end joined by an upwardly and outwardly tapered wall. The mandrel is driven downwardly in the earth to simultaneously form a vertical cavity while compacting the sidewall of the cavity to provide structural integrity. The mandrel is then moved upwardly from the bottom of the cavity and aggregate is deposited in the bottom of the cavity following which the mandrel is lowered so that its lower end engages the deposited aggregate and densifies the aggregate by vertical vibratory action and static force with these steps being repeated until the pier top is near the surface of the earth. A second embodiment includes a conduit in the primary mandrel for injecting concrete or grout into aggregate previously deposited in the cavity.02-27-2014
20140314497Polymer grouting method for constructing gravel pile - A polymer grouting method for constructing gravel pile for reinforcing the soft and special soil foundation includes steps of: (1) pile-position-pore-forming; (2) installing a grouting pipe; (3) putting graded stones; (4) polymer lifting grouting; and (5) pile-forming. By pile-position-pore-forming, putting graded stones, polymer lifting grouting in the reinforcement site and other steps, the injected two-component expansive polymer material expands rapidly after a chemical reaction, and then is solidified with the graded stones for filling in the pile hole from below to above, the blast hole wall rock-soil is expansive compacted and fully integrating with the surrounding rock-soil, thus forming the polymer gravel pile. The present invention can rapidly reinforce the soft and special soil foundation, thereby providing an advanced, highly efficient, safe and practical method for reinforcing the soft and special soil foundation. It has great economic and social benefits and broad development prospects.10-23-2014
20160017562RAPID PIER - A method and apparatus for rapidly constructing a structural pier comprising the steps of placing into a soil under a structure to be supported a casing having an inner diameter and an outer diameter, positioning an injection tube into the inner diameter of the casing, and injecting an expansive material into the casing. Optional perforations in the casing allow some of the expansive material to be ejected from the casing into the surrounding soil to create fingers or branches for the purpose of adding friction to the structural pier.01-21-2016
20160177528Method and Apparatus for Ground Improvement Using Compacted Aggregate Columns06-23-2016
405241000 Dispensing auger 3
20120087740AUGER GROUTED DISPLACEMENT PILE - Disclosed in this specification is a method and apparatus for placing an auger grouted displacement pile or helical pile in soil. The pile has an elongated shaft with at least one lateral compaction protrusion which establishes a regular bore diameter in the supporting medium. The pile also has a helical blade configured to move the pile into the supporting medium. The bottom of the shaft includes means for forming irregularities in the bore diameter after compaction by the lateral compaction protrusion. The bore is then filled with grout while leaving the pile in the soil.04-12-2012
20150345094APPARATUS AND METHODS FOR THE PLACEMENT OF PIPE PILING - Apparatus and methods for the installation of pipe pilings into the ground for use as structural building foundations, geothermal piles, or both, are disclosed. In addition to specialized fittings for pipe pile assemblies, the inventions include specialized drive mechanisms used in conjunction with rotary or vibratory motors. Methods of installing pipe pilings are further improved with the disclosure of methods of adding grout or similar materials during or after installation of the piles.12-03-2015
20160060838SEISMIC RESTRAINT HELICAL PILE SYSTEMS AND METHOD AND APPARATUS FOR FORMING SAME - A reinforced helical pile system suitable for use in seismically active areas incorporates steel fibers in the grout and a fiber reinforced polymer sleeve (casing). A low-friction driving assembly and low-friction sleeve couplings enable the sleeve to be drawn into the soil substantially without rotation, reducing power consumption and preserving the integrity of the casing.03-03-2016
405243000 Withdrawing form structure 1
20140178131Efficiency of Geothermal Ground Improvement System - Provided herein are apparatus, systems and methods for use in ground construction. New ground improvement methods have been developed using pervious concrete piles, the piles having material properties of the pervious concrete, as well as positive response to different vertical loads. The methods produce piles that are superior to aggregate piles in most aspects, and that can be utilized in construction in a wider variety of soils and applications, including in geothermal heat exchange (energy pile) systems.06-26-2014

Patent applications in class Casting in situ hardenable fluent material

Patent applications in all subclasses Casting in situ hardenable fluent material