UNDERGROUND PASSAGEWAY, E.G., TUNNEL

Subclass of:

405 - Hydraulic and earth engineering

Patent class list (only not empty are listed)

Deeper subclasses:

Class / Patent application numberDescriptionNumber of patent applications / Date published
405132000UNDERGROUND PASSAGEWAY, E.G., TUNNEL73
20080205989Method for Tunnel Construction - There is provided a method of constructing a section of a half-tunnel in a slope (08-28-2008
20090136299TUNNEL SUPPORTED ON BEARING BLOCKS - The tunnel supported on bearing blocks is a tunnel to be executed in weak soils, which is constituted by two tubes: an exterior tube, formed by precast elements, which are mounted by a tunnel boring machine, and an interior tube, which is built using the exterior one as the exterior formwork and constitutes the resistant element of the tunnel, both being supported by bearing blocks, regularly spaced along the axis of the tunnel. The bearing blocks are extended downwards until the stiff soil through resistant elements with great horizontal flexibility in order to resist vertical loads, while allowing for horizontal movements of the tunnel during an earthquake.05-28-2009
20100098496TUNNEL MULTI GALLERY - Railway tunnel of circular section with two lines, constructed with tunnel boring machine, having a separating wall, disposed at the middle of the tunnel, and a slab, placed slightly over the bottom of the tunnel, forming two independent and isolated railway galleries, disposed side by side, one for each line, and a service gallery. The separating wall is resistant to fire and to the piston effect of the trains, and disposes of large openings, provided with fire doors, regularly spaced along the length of the tunnel. The slab disposes of openings, placed close to the circular wall, on both sides and regularly spaced and protected with fire devices of box type. The service gallery is provided with emergency vehicles of shuttle type, which may circulate suspended from the slab.04-22-2010
20100189512APPARATUS AND METHODS FOR UNDERGROUND STRUCTURES AND CONSTRUCTION THEREOF - Described herein are apparatus, systems and methods useful in forming underground vertical structures. Methods are described for constructing an underground vertical structure, comprising the steps of excavating soil to a sufficient depth to create a circular void to accommodate a plurality of segments; assembling a ring shaped structure comprising the plurality of segments; connecting the outside surface of the ring shaped structure with the soil in said circular void, thereby securing the ring shaped structure to the soil; excavating earth beneath the ring shaped structure to accommodate a second ring shaped structure; and repeating steps b-d thereby forming one or more additional ring shaped structures downward into the earth below already formed ring shaped structures until a predetermined depth is reached; thereby forming the underground vertical structure. Systems to perform the above methods are also disclosed.07-29-2010
20120294680Device and method for anchoring a cable bolt - The invention provides a method for anchoring a cable bolt in a ground formation using a multi-part resin system and an injection adaptor for use in the anchoring method.11-22-2012
20130243528Formation of Underground Constructions - The invention relates to a method and apparatus for the formation of underground structures. The method includes the provision of the formation of at least two spaced support structures which are provided to include a slide track thereon to receive and allow the sliding movement therealong of a roof structure which is moved into position once the support structures are formed to form the underground structure. The support structures can include piled foundations and include a series of units in which the slide tracks are formed. Further articles can be provided to allow the excretion of lubricant to allow the movement of the structure units into position to be improved. Said articles can also be used subsequently to receive a filler material to allow any spaces between the structure and surrounding soil or rock to be filled.09-19-2013
20140314490PUMPABLE MINE VENTILATION STRUCTURE - A pumpable mine ventilation stopping wall structure comprised of a pumpable bag having spaced walls of generally parallel nonporous and flexible sheets with the sheets retained in spaced relationship with spaced flexible cross ties. The perimeter of the spaced walls are closed off with a permeable mesh having a mesh size which will permit restricted flow of cementitious grout therethrough for sealing the wall structure to surrounding rough mine faces. The bag is provided with at least one grout fill port for filling the bag by pumping cementitious grout into the bag.10-23-2014
20150110561STRUCTURE FOR REDUCING TUNNEL MICRO PRESSURE WAVE INCLUDING AIR PIPE - A structure for reducing a tunnel micro pressure wave is provided. The structure includes a hood structure formed in front of an entry of a railroad tunnel; and an air pipe section in which at least one air pipe is provided along the circumference of the hood structure, wherein the air pipe comprises a horizontal introduction section formed to be extended from an internal side of the hood structure toward a longitudinal direction of the hood structure, an outlet section formed on an external side of the hood structure, and an intermediate section connecting the horizontal introduction section and the outlet section through each other.04-23-2015
405133000 Vertical 3
20120163919METHOD FOR ERECTING AN UNDERGROUND CONSTRUCTION - The invention relates to a method for erecting an underground structure, wherein the method is intended to ensure that the underground structure is assembled as safely as possible. The method is characterized in that a shaft is sunk at the erection site and the shaft is closed off by a cover in which an opening is provided, in that a lifting/lowering device is provided in the region of the opening, in that a locking mechanism is provided in the shaft below the opening, in that a section of the structure is provided in the region of the opening and is connected to the lifting/lowering device, is lowered through the opening down to the locking mechanism and locked and is then released from the lifting/lowering device after locking, in that a process cycle is performed in which a further section of the structure is provided in the region of the opening, said section is connected to the lifting/lowering device and to the locked section of the structure, then the locking of the previous section is released, the structure sections situated in the shaft are lowered until the uppermost section is situated in the locking region, and the uppermost section of the structure is locked, and this process cycle is repeated until the sections required for erecting the underground structure have been inserted into the shaft.06-28-2012
20140050531SHAFT CONSTRUCTION IN THE EARTH AND METHOD THEREOF - A method of constructing a shaft in the earth for use as, for example, a launch shaft or a retrieval shaft, may include several steps. One step includes installing a secant pile wall into the earth. The secant pile wall encloses a portion of the earth. Another step includes excavating the portion of the earth enclosed by the secant pile wall. The excavated portion leaves an interior of the shaft and exposes an inside surface of the secant pile wall. Yet another step includes placing a metal liner within the interior of the shaft. And yet another step includes partially or more filling a space located between the inside surface of the secant pile wall and the metal liner with a grout material.02-20-2014
20150023735System for renovating a sewer manhole - A method for renovating a sewer manhole includes: a. pulling an inflatable film sleeve onto a mold corresponding to the sewer manhole profile; b. wrapping and/or laying an extensible textile strip of the film sleeve onto the mold, a non-extensible high-tensile-strength longitudinal strip also being laid in an axial direction between the strips; c. attaching a protective sheath enclosing the liner manufactured in this manner; d. pulling the liner off the mold that has been reduced in a radial direction; e. inserting the liner into a sewer manhole to be renovated, and introducing a pressure-tight bag into the inner film sleeve of the liner; f. sealing the liner at the upper end and inflating until it abuts against the manhole wall; g. curing the resin-impregnated liner. A variable mold, which is assembled from modules of different shapes and sizes corresponding to the sewer manhole, serves for manufacture of the liner.01-22-2015
405134000 Sectional 4
20100310318POSITIONING A SINKING TUNNEL SECTION - A positioning apparatus includes a frame and two substantially vertically extending legs. The frame includes a suspension device adapted to suspend a sinking tunnel section. The legs include upper ends connected by a substantially horizontally extending beam and lower ends vertically movable relative to the sinking tunnel section. The legs include clamping members for engaging opposite transverse sides of the tunnel section that are settable substantially in a plane defined by the legs and beam of the frame. The frame is devised for extending with its legs outwardly of the two opposite transverse sides of the tunnel section and extending with the beam above a roof of the tunnel section.12-09-2010
20150322630METHOD AND APPARATUS FOR FORMING TUNNELS AND TUNNELS FORMED THEREBY - A method of forming tunnels(11-12-2015
405135000 Seal or joint 2
20120027521Engineered Mine Seal - A method for designing and fabricating a mine seal includes determining an initial thickness for a mine seal based on a predetermined underground opening, developing and solving a numerical model for response of the mine seal upon application of a blasting pressure, and determining whether the mine seal meets predetermined design criteria. A mine seal having a minimum seal thickness may be fabricated after determining the mine seal meets the predetermined design criteria.02-02-2012
20150125215METHOD FOR CONSTRUCTING A TUNNEL COURSE, AND STRUCTURAL ELEMENT FOR USE BY THE METHOD - A method and a structural element for the construction of a directionally flexible and watertight tunnel lining (05-07-2015
405136000 Subaqueous 2
20100092243UNDERWATER SUSPENDED TUNNEL - An underwater suspended tunnel (04-15-2010
20170233977CORROSION-RESISTANT FLUID MEMBRANE08-17-2017
405138000 Boring 17
20090092446Fastening element - A fastening element has a drilling head (04-09-2009
20090297273APPARATUS AND METHOD FOR MONITORING TUNNEL BORING EFFICIENCY - A tunnel boring machine (12-03-2009
20100028084DOOR ARRANGEMENT FOR A TUNNELING MACHINE - The present invention provides a door arrangement for a tunneling machine. The door arrangement is for location at the front of the tunneling machine adjacent to the digging end of the machine. The door arrangement allows for the interior of the machine to be sealed off from the tunnel face, while also allowing for the door arrangement to be opened and allow complete access to the tunnel face. The door arrangement comprises door sections for hinged connection to a tunneling machine, the door sections being pivotable about the hinged connection between a closed position sealing the tunneling machine and an open position allowing the tunneling machine access to a tunnel face.02-04-2010
20100086359METHOD OF DIRECTING DRILLING PATTERN IN CURVED TUNNELS, ROCK DRILLING RIG, AND SOFTWARE PRODUCT - A method of determining a direction of a drilling pattern in tunnel curve calculation to be executed in a control unit of a rock drilling rig. The invention further relates to a storage device including software product implementing the method, and a rock drilling rig. A tunnel line of a tunnel to be excavated is determined e.g. by using curve fitting. A location of a drilling site on the tunnel line is communicated to the control unit and a navigation plane of the drilling pattern is positioned on the tunnel line. A start point of a round is positioned on the tunnel line and a length of the round is provided. Further, an end point of the round is positioned at a distance corresponding with the length of the round from the start point and a coordinate system of the drilling pattern is directed such that one of its axes points from the start point to the end point. Finally, different coordinate systems are transformed.04-08-2010
20110008107TAIL SEALS - Tail seal compound (tail seal) for tunnelling machine comprising blown oils, more than 30% by weight of a mineral charge and fibrous material.01-13-2011
20130045055METHOD FOR REPLACING A TUNNEL BORING MACHINE ROLLER CUTTER, HANDLING DEVICE AND ROLLER CUTTER SUITED TO SUCH A METHOD - The invention relates to a method for replacing a disk cutter (02-21-2013
20140219725TUNNELING APPARATUS - A tunneling apparatus includes a drill head and a steering shell. The drill head includes a main body having a distal end and an oppositely disposed proximal end. The steering shell is disposed at the distal end of the drill head and is moveable relative to the main body of the drill head. The drill head includes structure that assists in maintaining a precise line even in soft drilling conditions.08-07-2014
405139000 With auxiliary tunnel 1
20150078831AUXILIARY TUNNELING APPARATUS - An auxiliary tunneling apparatus includes a reaction force receiver and first and second split components. In the excavation of a second tunnel by a boring machine, the reaction force receiver forms a replacement face of a side wall of the second tunnel on a first tunnel side where the first and second tunnels intersect each other, and a gripper of the boring machine pushes against the replacement face. The first and second split components are installed to push against the side wall of the first tunnel, support the reaction force receiver within the first tunnel, and move back and forth with respect to the side wall of the first tunnel.03-19-2015
405141000 Shield 9
20110103892MODIFICATIONS TO A TBM STRUCTURE TO PROVIDE ROOF SUPPORT INSTALLATION - A TBM having a cylindrically shaped member located on said TBM just behind the rotating boring head, said member being of similar diameter as said tunnel and comprising sectionalized components so as to be adjustable in diameter, said member having a plurality of steel angle members welded to the surface of the top-most component so as to extend axially along the length of said cylindrically shaped member, said steel angle members forming axially extending receptacles therein.05-05-2011
20140079485Method for Preventing Shield Casing Catching Due to Too Large Frictional Resistance in Earth Pressure Balance Shield Machine - A method for preventing shield jamming by excessive frictional resistance in earth pressure balance shield which involves real-time monitoring of earth pressure signal for earth pressure on the shield body through sensors on the shield machine. Combined with the known parameters, resistance in the shield machine is calculated. The friction F03-20-2014
405144000 Door or bulkhead 2
20080253841HYDRAULICALLY POWERED DOOR AND SYSTEMS FOR OPERATING SAME IN LOW-TEMPERATURE ENVIRONMENTS - A hydraulic system has a hydraulic actuator for moving a door leaf of a door installation between open and closed positions thereof. A reservoir has a volume for containing a hydraulic fluid. A fluid circuit provides fluid communication between the hydraulic actuator and the reservoir. The system also has a pump for pumping hydraulic fluid from the reservoir into the fluid circuit to operate the actuator. A fluid circuit flushing system of the hydraulic system operates to flush a volume of hydraulic fluid from the fluid circuit back to the reservoir without moving any door leaves of the door installation. The hydraulic system may be part of a mine door installation installed in a mine passageway and having at least one door leaf. The hydraulic actuator is connected to the door leaf for driving movement of the door leaf between its open and closed positions.10-16-2008
20090010715Mine Seal With Adhesive - An explosive-resistant mine seal is provided, which includes a pair of block walls. An adhesive is provided between adjoining surfaces of the blocks where the adhesive has greater strength properties than the blocks themselves. A core member is provided between the two walls and is bound thereto. The adhesive may be coated over the walls to increase the strength of the mine seal.01-08-2009
405146000 Lining installation 2
20100284748UNDERGROUND MINING APPARATUS - An underground mining apparatus includes a mining head for moving through underground material to extract material in its path and form a passageway behind the mining head as it advances. An elongate structure extends along the passageway to the mining head and provides a path for delivering the extracted material to ground surface. A shroud is positioned about the elongate structure for supporting engagement with the periphery of the passageway and to provide a space through which the elongate structure can move. The shroud has a cross-sectional shape corresponding generally to the cross-sectional shape of the passageway formed by the mining head. A method is also disclosed.11-11-2010
20160201459MOBILE CONVEYOR DEVICE FOR THE DELIVERY OF TUNNEL LINERS07-14-2016
405147000 Seal 3
20090279955Mine Seal With Electrically Non-Conductive Ties - A mine seal comprising two spaced apart walls, at least one electrically non-conductive tie extending between the walls and holding them in place against forces tending to separate the walls, and a filler material filling the space between the walls. A form for making such a mine seal is also disclosed.11-12-2009
20110135395INFLATABLE TUNNEL SEAL - A tunnel seal including a body, inflatable from a folded position to an inflated position, multiple positioning straps coupled to the body, an inflow port fluidly connected to the body, a pressure relief valve fluidly connected to the body, and a hot stab receptacle fluidly connected to the inflow port.06-09-2011
20130251454MINE SEAL WITH ELECTRICALLY NON-CONDUCTIVE TIES - This invention is directed to an electrically non-conductive tie for use in a mine seal having opposing walls defining a space for receiving filler material. The tie has opposite ends, a length and a width and is made at least in part from an electrically non-conductive material which extends across substantially the entire width of the tie for preventing conduction of electrical current from one end of the tie to the other. Openings are provided adjacent opposite ends of the tie for receiving wall supports for the mine seal.09-26-2013
405149000 Cut and cover 3
20110020066Reinforced Soil Arch - This invention relates to a novel design of reinforced soil arches which can be used to construct bridges, overpasses, underpasses, snow sheds, landslide and rock fall protection structures, and the like. The reinforced soil arch comprises alternating layers of compacted mineral soil and geosynthetic reinforcement located on and adjacent to each side of an arch form to construct a versatile and environmentally compatible reinforced soil arch that can be used for numerous purposes. The invention includes a method of constructing a self-supporting reinforced soil arch comprising: (a) placing on the ground at the location where the soil arch is to be erected an archway form, said top surface of said archway form having disposed thereon a plurality of shear resisting devices; (b) erecting adjacent to and on the archway form a combination of alternating and interacting layers of compacted mineral soil and geosynthetic reinforcement material, the interface between the alternating layers of compacted mineral soil and geosynthetic reinforcement material and the top surface of the archway form being connected by the series of shear resisting devices on the top surface of the archway form.01-27-2011
20130177357PRELIMINARY CONSTRUCTION METHOD OF IN-PLANT TRENCH OF NUCLEAR POWER PLANT - The embodiment of the present invention is a preliminary construction method of an in-plant trench of a nuclear power plant, the method. The method includes: constructing a plurality of buildings for generating an atomic energy; constructing a trench between the buildings via a platform configured to adjust a level of the trench with an installation level of the trench; and backfilling an area between a ground and the trench, after the construction of the trench.07-11-2013
20140363236REINFORCED ARCH WITH FLOATING FOOTER AND METHOD OF CONSTRUCTING SAME - A reinforced soil arch having a floating footer is provided. The reinforced soil arch has an archway form, a plurality of layers of reinforcement material and compacted fill associated with the archway form, and a floating footer supporting the archway form. The archway form floats on a compressible squeeze block in the floating footer. Methods of constructing a reinforced soil arch are provided.12-11-2014
405150100 Lining 36
20090003934Mapping of contaminants in geologic formations - An apparatus and method for evaluating chemicals of interest in a subsurface bore hole, such as a groundwater sampling well. An absorbent member is attached it a flexible liner, and the liner is everted by fluid pressure down the borehole. The everted liner presses the absorbent member against the wall of the borehole. Any chemicals of interest are absorbed into the absorbent member from the media surrounding the borehole. The liner, with associated absorbent member thereon, is then extracted from the borehole. The absorbent member may then be subjected to any suitable laboratory analysis to evaluate the type, spatial distribution, and concentration of chemicals of interest, such as water contaminants occurring in the borehole.01-01-2009
20100008729Method for rehabilitating a manhole - To line an inner circumferential surface of side walls of a manhole, a rehabilitating sheet made of a sheet material resistant to water and corrosion is provided in the form of a bag having a shape corresponding to the inner circumferential surface to be lined. The rehabilitating sheet is inserted into the manhole to be lined. Block and plate frames are coupled inside the bag of the rehabilitating sheet to support it so as to have the shape corresponding to the inner circumferential surface to be lined. A gap between the rehabilitating sheet and the inner circumferential surface of the side walls of the manhole is filled with a filler, which is then hardened to line the side walls of the manhole. Pairs of plate frames having different diameters are coupled to each other to provide ring plates having different diameters. The ring plates are stacked one by one from the maximum one to support the rehabilitating sheet so as to have a shape of the inner circumferential surface of the inclined side wall portion of the manhole.01-14-2010
20100209196MANHOLE REPAIRS - A method and apparatus for repairing manholes with a liner. The liner can be assembled from side plates and connector plates. The liner is conveniently inserted into a damaged manhole, is adjusted, and concrete is poured behind the liner into voids above the manhole brickwork.08-19-2010
20110008108Structure and method for manhole wall sealing - Structures and methods for repair of leaks in the walls of manhole assemblies are provided through use of at least one repair panel comprising a structural member and a sealing member attached to one another. In some embodiments, a plurality of repair panels as provided are present in an end-to-end configuration to yield a seal the extends coextensively with the inner wall surface of a manhole assembly. In some embodiments, a plurality of repair panels as provided are present in an side-by-side configuration on the inner wall surface of a manhole assembly.01-13-2011
20110103893TUNNEL MULTI FLOOR - A multiple floor roadway tunnel has a circular wall and two horizontal slabs, one above the other and spaced apart to create three separate galleries within the tunnel. A service gallery is located between the bottom of the circular wall and the lower horizontal slab. A lower roadway gallery is located between the lower and the upper horizontal slabs. An upper roadway gallery is located between the upper horizontal slab and the top of the circular wall. Openings in the upper and lower slabs are located proximate the circular wall in spaced apart intervals and protected by fire devices of box type, which are connected by closed vertical access galleries for passage of people between galleries. The service gallery has at least one circulating shuttle vehicle, which may suspended from the lower horizontal slab, to allow for local access and the evacuation of people.05-05-2011
20110129299Concrete repair of tubbings06-02-2011
20110150575Method and Apparatus for Lining Tunnel Walls or Tunnel Ceilings with Protective Nets - In a method for lining tunnel walls or ceilings with protective nets or the like, web-shaped protective net material (06-23-2011
20120009020MANHOLE LINER AND METHOD OF USING THE SAME - A manhole liner and a method of using the same are provided. The manhole liner is sized substantially equally to the largest diameter of the manhole, so that the liner does not have to stretch to be pressed against the manhole wall. Additionally, the liner is impregnated with a resinous material capable of curing and hardening. A bladder, preferably stretchable circumferentially and having a diameter less than the smallest diameter of the manhole, is inserted into the liner. The bladder is expanded to press the liner against the wall of the manhole to dispense resinous material from the liner, while the liner is able to fold over itself in areas having a diameter less than the original diameter of the liner. Because the bladder stretches to produce a smooth outside surface, the resinous material will migrate to areas in the folds and will cure with a smooth interior surface.01-12-2012
20120107049TUNNEL REINFORCEMENT STRUCTURE AND TUNNEL CONSTRUCTION METHOD CAPABLE OF CONTROLLING GROUND DISPLACEMENT USING PRESSURIZATION - The present invention relates to a tunnel reinforcement structure capable of controlling ground displacement using pressurization, including: reinforcements adapted to be forcedly inserted into the bored holes formed along the outer surface of the section to be excavated of the tunnel; auxiliary reinforcements disposed between the reinforcements from a point between 4 m and 8 m inwardly from the ends of the reinforcements; steel ribs disposed on the inner four faces of the excavation face of the tunnel; pressurizing bags each provided between the steel ribs and the excavated inner surface of the tunnel; a concrete part adapted to be cast between the steel ribs; and lining concrete adapted to be cast to the steel ribs and the inner surface of the concrete part.05-03-2012
20120121337SYSTEMS AND METHODS FOR PROVIDING A CONCRETE-REINFORCED BORE - Systems and methods are provided for constructing a lined reinforcement structure that covers a portion of an interior wall of a bore. A plurality of axial lining segments; and a bracing station axially moveable along the bore are provided. The bracing station comprises formwork component(s) coupled to brace mechanism(s) for bracing the formwork components against inwardly directed forces the brace mechanism(s) moveable between extended configurations wherein the formwork component(s) are closer to the interior bore wall and retracted configurations wherein the formwork components are further from the interior bore wall.05-17-2012
20120301223RIB FOR SUPPORTING AND REINFORCING AN EXCAVATION - The present invention relates to a rib (11-29-2012
20140050532MESH HANDLING APPARATUS AND RELATED METHODS - An apparatus applies mesh from a roll to a face of a mine passage. A spindle is adapted for supporting the roll of mesh. An arm supporting the spindle extends in a generally vertical direction and is adapted for rotation about an axis aligned with a direction of elongation of the mine passage such that the spindle traverses a path for applying the mesh from the roll to the face. A mast independent of the arm carries a drill head for drilling into the face of the mine passage. Related methods are also described.02-20-2014
20140126961LOW PROFILE CAN DESCENDER - A mining can descender comprising a plurality of strand jacks configured to work in concert to lower a load disposed between a first strand jack and a second strand jack a base configured to accommodate said plurality of strand jacks mounted there to, wherein said base comprises a plurality of assembled sections.05-08-2014
20140301787Mine Seal and Method of Construction for High Resistance to Transverse Loads - A mine seal or wall capable of retaining its integrity under a transverse load. The mine seal is constructed of a plurality of interlocking masonry blocks. The interlocking blocks include a body with a top surface, planar sides, planar ends, and a bottom surface. A top shear lug extends longitudinally along the top of the block. An end shear lug extends vertically along each end of the block. The bottom surface and each end of the block includes a groove therein. When stacked end to end in successive rows, the top and end shear lugs of each interlocking block engage the complimentary grooves in the adjacent blocks thereby enabling the blocks to self-align vertically and lock together as they are stacked. The resulting mine seal exhibits a high resistance to transverse loads.10-09-2014
20150050088TUNNELING OR EXTRACTION MACHINE WITH AN ANCHOR-SETTING DEVICE AND SUPPORT MANIPULATOR OR SUPPORTING DEVICE - A tunneling or extraction machine includes cutting tools that are movable over the heading face and are arranged on the boom, and a platform that is movable in the longitudinal direction of the machine and carries roof support devices. The roof support devices include a support manipulator or a supporting device and an anchor-boring and anchor setting device. The anchor-boring and anchor setting device are fastened to the moving platform in a pivotable manner between a parked position and an operating position. The support manipulator or the supporting device has a telescopic arm that is fastened to the movable platform in a vertically pivotable manner, wherein the support manipulator or the supporting device and the anchor-boring and anchor setting device are fastened to the movable platform at a pre-defined, fixed distance apart from one another and are displaceable together with the moving platform between a retracted position and a forwardly displaced position.02-19-2015
20150086272SELF-MOVING TUNNEL SUPPORT CANOPY - A self-moving tunnel support canopy includes front arch frame, rear arch frame, forward jack, and support jack disposed under the front arch frame. The front arch frame has front arch beams and front longitudinal beams longitudinally disposed along arch upper surfaces of front arch beams and coupled to all the front arch beams. The rear arch frame has rear arch beams and rear longitudinal beams longitudinally disposed along arch upper surfaces of the rear arch beams and coupled to all the rear arch beams. The front longitudinal beams and the rear arch beams are spacedly disposed, and a spacing is configured between the front arch beam and a front-adjacent rear arch beam. One end is coupled to the front arch frame, and the other end of the forward jack is coupled to the rear arch frame. The front arch beam and the rear arch beam are both arch-shaped beams.03-26-2015
20160010456METHOD FOR PRODUCING A TUBBING HAVING A THERMOPLASTIC SEALING LAYER01-14-2016
20160053456Apparatus and Method for Sealing Pipes and Underground Structures - An apparatus and method for sealing pipes or underground structures is provided. In one embodiment, the end of a pipe is sealed by the use of a pipe liner and a sealing member. The sealing member may be a hydrophilic material, a hydrophobic material, a compressible material, or a paste. The sealing member is held in place by a mechanical fastener and a liner is installed adjacent the sealing member and against the wall of the pipe or other structure to be sealed. In another embodiment, a manhole is sealed by the use of a sealing member, a mechanical fastener, and a manhole liner.02-25-2016
405150200 By spraying of settable material (e.g., concrete) 4
20120141210METHOD AND APPARATUS FOR REPAIRING THE WALL OF A MANHOLE - The present invention comprises a method and means for repairing the wall of a manhole wherein a material capable of curing and hardening is adhered to the wall. An expandable bladder engages the curable and hardenable material and presses against and smoothes the material. The bladder may be chemically bonded to the curable and hardenable material or it may be mechanically bonded.06-07-2012
20130343822LINER SYSTEM FOR MINES, TUNNELS AND OTHER GROUND STRUCTURES - A multi-layer liner system is provided, which may be applied using a spray process, where the initial layer facilitates adhesion to the earthen surface (e.g., rock wall surface) and a subsequent layer provides strength and elongation needed to maintain support system integrity even in the case of some rock movement at the wall surface. In one implementation, the initial layer is a structural foam primer layer and the subsequent layer is a fire-resistant top coat layer.12-26-2013
20160003042LINER SYSTEM FOR SALT MINE SHAFTS - A mine shaft protective barrier includes an undercut in a wall surface of the mine shaft proximate to and below a water ingress ingress elevation. A fire-resistant material is applied within the undercut and downward along the wall surface below the to form a coating barrier that extends from the undercut downward along the mine shaft such that water entering the wall surface at the ingress location tends to flow downward into contact with and along an inward facing surface of the coating barrier so as to inhibit such water from flowing in contact with and degrading the wall surface of the mine shaft below the ingress location.01-07-2016
20160097278WATERPROOFING SYSTEM FOR EXPOSED ROCK SURFACES - Polymer Rubber Gel is heated to an elevated temperature and sprayed against the exposed rock to form a generally uniform surface. The Polymer Rubber Gel can be sprayed on the rock surface using a heated want coupled to a heated kettle. Then, a layer of I polyethylene is formed against the polymer rubber gel layer. Finally, a finish layer such as concrete, tile, brick or segmental wall block is placed against the outer side of the polyethylene layer.04-07-2016
405151000 Panel 14
405152000 With sealing feature 12
20110129300STEEL LINERS FOR TUNNELS - The present invention is directed to a steel segment assembly for lining a tunnel. The segment assembly has a frame to which is attached a steel panel, the frame and panel being a segment of a cylinder dimensioned to the desired tunnel diameter. The frame is preferably square, rectangular or trapezoidal in shape and is constructed of suitably dimensioned members having a square or rectangular cross section welded together. The frame has two curved spaced apart side members to form the long sides of the frame, the curved spaced apart side members being joined together at either end by end members to form the short sides of the frame. At least one intermediate member is provided between the two end members to bridge the two curved spaced apart side members to provide transverse structural support to the steel segment assembly.06-02-2011
20110188939MINE SHAFT LINER PLATE SYSTEM AND METHOD - A liner plate structure, system and method is provided for lining of mine shaft bores, tunnels and the like. The liner plate structure includes a primary plate portion and at least one flange disposed at a side edge of the primary plate portion. A thermoplastic fusion element extends along an exterior surface of the flange. A liner structure within a shaft or tunnel includes at least first and second liner plate members assembled together, the liner plate members formed of metal plate material having respective metal surfaces in contact with each other along a plate joint. A thermoplastic fusion seal arrangement is located along the plate joint. A method of lining a mine shaft bore includes: providing a plurality of liner plate members, each liner plate member having a curved shape; assembling a first set of liner plate members into a first ring structure; assembling a second set of liner plate members into a second ring structure; mounting the second ring structure in abutting contact with the first ring structure; and forming at least one seal between the first ring structure and the second ring structure.08-04-2011
20120121338SEALING ARRANGEMENT FOR SHAFT AND TUNNEL CONSTRUCTION - A sealing arrangement for shaft and tunnel construction. The elastic tension forces that arise when the sealing systems are pressed against each other by reducing the joint clearance, after the systems have been brought into contact with each other, are reduced or completely avoided relative to prior art, and the required surface contact pressure is achieved by means of a self-sealing force effect of the media pressure. In order to achieve the force effect, the geometry of the sealing elements of the sealing system is designed such that the elements comprise pressure surfaces relative to a vacuum or atmosphere after contacting each other. A differential pressure acts on the pressure surfaces, resulting in the force ensuring the required surface contact pressure on the surface, by means of which the sealing elements contact one another at the contact plane.05-17-2012
20120213590MINE SHAFT LINER PLATE SYSTEM AND METHOD - A liner plate structure, system and method is provided for lining of mine shaft bores, tunnels and the like. The liner plate structure includes a primary plate portion and at least one flange disposed at a side edge of the primary plate portion. A polymer seal element extends along a recess within an exterior surface of the flange.08-23-2012
20120237300TUBBING LINING HAVING AN INTEGRATED FLEXIBLE ELEMENT - A tubbing lining for a tunnel or shaft is formed from tubbing rings having annular end surfaces, with successively tubbing rings are aligned with each other at annular end surfaces forming an annular joint. Each tubbing ring is composed of successive circumferentially arranged tubbing segments which are butt-joined. A deformable flexible element having an outer cross-sectional contour is arranged in at least one butt joint, with the cross-sectional contour parallel to the butt joint matching outer contours of the end faces such that the flexible element completely covers at least one abutting end face. The tubbing segments in conjunction with the flexible element form a prefabricated element formed of a steel reinforcing framework encased in concrete to which the flexible element is connected in a force-locked manner.09-20-2012
20120301224Protective element, concrete element, and method for producing a concrete element - The invention relates to a protective element (11-29-2012
20120328369SEALING ARRANGEMENT FOR SHAFT AND TUNNEL CONSTRUCTIONS - A sealing arrangement for shaft and tunnel constructions. The sealing of gaps between components of shaft and tunnel constructions is improved, in particular if the components are misaligned. For this purpose a) the sealing arrangement (12-27-2012
20140086686LOW PROFILE MINE SHAFT LINER PLATE SYSTEM AND METHOD - A liner plate system for lining shafts or tunnels is provided. The system includes a plurality of curved liner plate units and a plurality of line lock plates. Each curved liner plate unit includes a radially outer side and a radially inner side, the radially inner side including a peripherally extending seal recess having a seal material thereon. Each liner lock plate has an inner side and an outer side, the outer side including a seal recess formed therein, the seal recess having a seal material thereon. The curved liner plate units and the liner lock plates arranged to form a curved wall structure.03-27-2014
20140193204TUBBING HAVING A THERMOPLASTIC SEALING LAYER - For a tubbing made of concrete for lining a tunnel, such as a traffic tunnel, the tubbing can have a convexly curved outer surface and a concavely curved inner surface opposite the outer surface. The tubbing can be provided with a thermoplastic sealing layer on the outer surface of the concrete tubbing. The thermoplastic sealing layer can also be arranged on all sides of the outside surfaces facing the outer surface. The tubbing can, for example, have a recess that extends around the outer surface in a frame shape, and the sealing layer engages in the recess.07-10-2014
20140356072MINE SHAFT LINER PLATE SYSTEM AND METHOD - A liner plate structure, system and method is provided for lining of mine shaft bores, tunnels and the like. The liner plate structure includes a primary plate portion and at least one flange disposed at a side edge of the primary plate portion. A polymer seal element extends along a recess within an exterior surface of the flange.12-04-2014
20150361793METHOD FOR PRODUCING A TUBBING WITH A THERMOPLASTIC SEALING LAYER - The core of the invention is a method for producing a tubbing of concrete for jacketing a tunnel, in particular a traffic tunnel, wherein the tubbing has a convexly curved outer surface and a concavely curved inner surface opposite the outer surface, comprising the steps a) placing a membrane comprising a hot-melt adhesive layer and a thermoplastic sealing layer on the outer surface and, furthermore, on all sides of the outer side surfaces of the tubbing, which sides face the outer surface, wherein the hot-melt adhesive layer faces the tubbing; b) supplying heat under the partial melting of the hot-melt adhesive layer; and c) cooling the hot-melt adhesive layer with formation of an adhesive composite between membrane and the tubbing.12-17-2015
20160053614PROTECTIVE ELEMENT, CONCRETE ELEMENT, AND METHOD FOR PRODUCING A CONCRETE ELEMENT - The invention relates to a protective element for connecting to a concrete element (02-25-2016
405153000 With separate fastening means between adjacent panels 2
20140308079C-Channel Panel, Overcast, Stopping and Method - A panel includes a core having a top, a bottom, a first side and a second side. The panel includes a first cap disposed on the top. The panel includes a second cap disposed on the bottom. The panel includes a first grid disposed adjacent the first side. The panel includes a second grid disposed adjacent the second side. The first cap and the second cap and the first grid and the second grid defining a frame which envelopes and holds the core without piercing through the core. A stopping. An overcast. A method for building a wall.10-16-2014
20160047242WATER AND/OR FIRE RESISTANT TUNNEL EXPANSION JOINT SYSTEMS - A fire and/or water resistant expansion joint system for installation between substrates of a tunnel. The system includes a fire resistant coating applied at a predetermined thickness to achieve a substantially uniform layer on the substrates and a fire and water resistant expansion joint. The expansion joint includes a core having an edge, wherein the substantially uniform layer of the coating extends along the substrates of the tunnel to the edge of the core, and a fire retardant infused into the core. The core is configured to facilitate the compression of the expansion joint system when installed between the substrates. The coating and the fire and water resistant expansion joint are each capable of withstanding exposure to a temperature of at least about 540° C. or greater for about five minutes.02-18-2016