Class / Patent application number | Description | Number of patent applications / Date published |
405116000 | In situ construction | 18 |
20080253838 | Flood Wall - A portable, inflatable flood wall is characterized by a sheet of synthetic plastic material which is folded back on itself to define a chamber between bottom, rear and front portions of the sheet and within which at least one inflatable bladder is secured. When the bladder is inflated, the rear portion of the sheet is erected to a vertical position which prevents water from passing beyond the sheet. The front portion preferably contains a plurality of openings to allow water to enter the chamber. The weight of the water on the bottom portion of the sheet serves to hold the wall in place. A plurality of such walls may be connected in end-to-end relation to construct a wall of a desired length. | 10-16-2008 |
20080253839 | Machine for assembling silt fence - A machine which provides high quality, strong, relatively low-cost silt fencing in the proximity of the location of use of the produced silt fencing. It is within the scope of this invention to assemble material different from the material used for creation of “silt fencing”, which “fence” may be useful in different manner and be incorporated for different purpose than the purpose of silt fence. The machine basically is a simple machine having substantially four (4) sections: a front/input section which provides for the attachment of fabric and for the feeding or advancing of the fabric from a fabric roll onto and over a substantially flat and stake location surface; a stake attaching section where a first stake (to become the first drive stake) is attached, then following the advance or feed of 10 feet of fabric, a stake is attached to the fabric and a sequence of 10 stakes are attached creating an output roll of fencing substantially 100 feet in length; a fabric linear distance movement measuring section with automated start and stop of fabric feed at the set distance—for silt fencing this set distance is typically 10 feet—and following a 10 time sequence of automatic stake attachment, the feed does not start until a new first stake is attached and put onto the stake drive system; and a back/output section which provides for the automated power driven creation of a 100 foot roll of fencing. | 10-16-2008 |
20090324335 | Secondary containment system for an above-ground petroleum storage tank - A secondary containment system for an above-ground petroleum storage tank includes a berm rising above the ground surrounding the tank and spaced apart from the tank for defining a petroleum retention basin about the tank. An impermeable liner covers the ground between the tank and the berm. At least one drain is formed through the liner and into the underlying ground. A hydrocarbon sensor monitors the presence of petroleum in the drain. A control device responds to the presence of petroleum in the drain by closing a containment valve to prevent discharge of petroleum from the basin. An indicator device provides at least one of an audible and visible signal indicating that petroleum is sensed in the drain. | 12-31-2009 |
20090324336 | Secondary Containment System for an Above-Ground Petroleum Storage Tank - A secondary containment system for an above-ground petroleum storage tank includes a berm rising above the ground surrounding the tank and spaced apart from the tank for defining a petroleum retention basin about the tank. An impermeable liner covers the ground between the tank and the berm. At least one drain is formed through the liner and into the underlying ground. A hydrocarbon sensor monitors the presence of petroleum in the drain. A control device responds to the presence of petroleum in the drain by closing a containment valve to prevent discharge of petroleum from the basin. An indicator device provides at least one of an audible and visible signal indicating that petroleum is sensed in the drain. | 12-31-2009 |
20120070232 | INSTALLATION OF LEAKAGE BARRIERS TO ENHANCE YIELD OF MINERAL DEPOSITS IN UNLINED SOLAR POND SYSTEMS - Slurry walls and methods of using those slurry walls to seal unlined solar ponds are provided. The slurry walls are formed from a mixture comprising clay and cement in water. A trench is keyed into the dike surrounding the solar pond, down to a geotechnically predetermined level. The slurry is deposited into the trench and allowed to harden, after which it is covered with a membrane or other covering. The inventive slurry walls reduce, and preferably prevent, leakage of water from the solar pond. | 03-22-2012 |
20130259574 | Liquid Containment Berm and Method of Use - A liquid containment berm and its method of creation, assembly and use, wherein the berm has one or more interior seal members, a floor member and an outer wall member created by applying an expandable foam polymer along a desired retention or flow control pathway, the foam polymer expanding to form the liquid impermeable outer wall member. The berm is assembled and installed on site about a liquid container. | 10-03-2013 |
20130279987 | INSTALLATION OF LEAKAGE BARRIERS TO ENHANCE YIELD OF MINERAL DEPOSITS IN UNLINED SOLAR POND SYSTEMS - Slurry walls and methods of using those slurry walls to seal unlined solar ponds are provided. The slurry walls are formed from a mixture comprising clay and cement in water. A trench is keyed into the dike surrounding the solar pond, down to a geotechnically predetermined level. The slurry is deposited into the trench and allowed to harden, after which it is covered with a membrane or other covering. The inventive slurry walls reduce, and preferably prevent, leakage of water from the solar pond. | 10-24-2013 |
20140154012 | ASSEMBLED MUD-ROCK FLOW DEBRIS DAM AND CONSTRUCTION METHOD THEREOF - A rapidly assembled debris flow sediment storage dam and a construction method are provided. The sediment storage dam has a main dam body with multiple prefabricated reinforced concrete rectangular boxes linked by vertical and horizontal connections. The top surface of each rectangular box is open, and the other five surfaces of the rectangular box are closed. Soil is used to fill each rectangular box. The main dam body is assembled above dam body foundations. Dam abutment foundations of the sediment storage dam and the inside slope of the dam body are filled with cement-laid stone masonry or concrete, while the top surface of the dam crest is also sealed using cement-laid stone masonry or concrete. | 06-05-2014 |
20140193203 | SANDBAG AND SANDBAG KITS - The present invention is directed to a unique, elongated sandbag for use as the bottom layer(s) in a sandbag barrier wall and a kit containing such an elongated sandbag as well as a sufficient number of other, shorter, sandbags for forming a barrier wall for an opening, such as a doorway. | 07-10-2014 |
20150063912 | Flexible Modular Liquid Dam - A modular liquid dam comprising a plurality of individual elongated members or segments that can be assembled in an end-to-end relationship to form a temporary liquid retainer or diverter on a substrate surface. The dam members are provided with one or more longitudinal bores or passages that reduce the amount of material in each member, thereby reducing manufacturing costs. The bores may extend completely through the dam member, may be internal bores closed off at each end, or may be bore segments intermittently spaced within the dam member. Intermittent bore segments provide internal bridging structures to increase the structural integrity of the dam member. Preferably the bore members are open on at least one end of the dam member such that a stiffener rod or rods of varying rigidity may be inserted into the dam members to increase and vary the rigidity of the dam member as desired Likewise, connection members may be formed in the dam members or inserted in the open ends of the bores to provide a mechanical or friction fit between adjoining dam members. | 03-05-2015 |
20150063913 | Flexible Modular Liquid Dam Assembly Having a Magnetic Connection System - A modular liquid dam comprising a plurality of individual elongated members or segments that can be assembled in an end-to-end relationship to form a temporary retainer or diverter on a substrate surface. The dam members are provided with a magnetic connection system having a magnet disposed within or exposed on the end of at least one adjacent dam member, the other adjacent dam member having a second magnet or metal member disposed within or exposed on its end, such that when the two dam members are abutted, the magnetic connection system maintains the dam members in abutting relationship. Structural mating members providing a mechanical or frictional fit may also be provided in the ends of the dam members to further enhance the connection in conjunction with the magnetic connection mechanism. | 03-05-2015 |
20150147120 | REMOVABLE FLOODWALL SYSTEM, COMPONENTS AND METHOD OF INSTALLATION - A floodwall system comprises a plurality of wall panels detachably attached to a plurality of columns that are anchored to the ground. The plurality of wall panels include a plurality of chambers that receive water through perforations to increase the mass of these wall panels. | 05-28-2015 |
20150354160 | BERM OR LEVEE EXPANSION SYSTEM AND METHOD - A system and method to create or elevate a berm of a liquid retention facility by placement of lightweight fill material anchored by an impervious liner material(s). The impervious liner material is integral to a water retention system such as a containment system of a retention pond. The system and method can also be used to elevate the liquid retention height of a levee in combination with impervious liner retention material. By constructing the berm system on an existing levee, the effective height of the levee can be increased. The lightweight fill material provides the shape of the berm or levee extension. The liquid impervious liner material provides a watertight surface, the media for joining of the lightweight fill material, and the anchoring of the lightweight fill material to the existing berm or levee structure. | 12-10-2015 |
20150354161 | FILLABLE BARRIER BAG - Apparatus and methods relating to a barrier bag are disclosed herein. In one embodiment, the barrier bag is configured for installation in a doorway and includes a receiving cell for receiving a second barrier bag. The barrier bag may include removable attachment portions for attaching it to one or more additional barrier bags. | 12-10-2015 |
20160160462 | WATER-CONTROL STRUCTURE AND CLADDING ELEMENT THEREFOR - A water-control structure includes a control structure body ( | 06-09-2016 |
405117000 | Earthen | 3 |
20120087735 | Method for Constructing Water Barriers and Coastal Protection - The invention relates to a method for constructing a water barrier. In the method a core of quarry run is arranged on the underwater bottom and provided with a protective layer of stones or concrete blocks, with the proviso that, at least at the position of the water barrier, the underwater bottom is raised using bottom material. The method is particularly suitable for constructing a water barrier for relatively deep water. | 04-12-2012 |
20130022404 | METHOD AND SYSTEM FOR CREATING A FLOOD BARRIER - A method and apparatus for compacting material in a unit. In one embodiment the compacting apparatus comprises an attaching device, a base coupled to the attaching device, and a head coupled to the base, wherein the head comprises at least one sloping face. The head is lowered within the unit to compact material within the unit. As force is applied by the head, the sloping face distributes the force in a direction normal to the slope of the face. This compacts the material within the unit and prevents the formation of voids within the unit. | 01-24-2013 |
20160047109 | CUTTER AND A METHOD FOR PROVIDING A PIPING PROTECTION SYSTEM IN A DIKE BODY - The invention relates to a cutter and a method for making a barrier screen in a dike body for preventing soil particles. The cutter comprises: —a part that is oriented vertically when in use and that comprises a supply device for supplying to soil material of said dike body a binder for binding soil material that has been cut by said cutter, said vertically oriented part at a lower portion thereof being provided with chisels for cutting said soil material during a downward movement of said cutter; —as well as a part that is horizontally oriented when in use and that extends at both sides of said vertical part and wherein said parts that are provided at both sides comprise cylinders that are rotatable about a horizontal rotation axis and wherein said cylinders are provided with ground cultivating members for mixing soil material that has been machined by said chisels and said ground cultivating members. | 02-18-2016 |