Patent application number | Description | Published |
20080217002 | Sand control screen having a micro-perforated filtration layer - A sand control screen ( | 09-11-2008 |
20100051262 | Sand Control Screen Assembly and Method for Use of Same - A sand control screen assembly ( | 03-04-2010 |
20100051270 | Sand Control Screen Assembly and Method for Use of Same - A sand control screen assembly ( | 03-04-2010 |
20110011577 | SAND CONTROL SCREEN ASSEMBLY AND METHOD FOR USE OF SAME - A sand control screen assembly ( | 01-20-2011 |
20110011586 | SAND CONTROL SCREEN ASSEMBLY AND METHOD FOR USE OF SAME - A sand control screen assembly ( | 01-20-2011 |
20120090687 | Remotely Controllable Fluid Flow Control Assembly - Fluid flow control assemblies capable of being disposed in a wellbore for hydrocarbon fluid production are described. The fluid flow control assemblies can include valves that are actuated via controls from a component positioned at or near the surface to control direction of fluid flow downhole. Packers can be set, slurry can be circulated to screens, and hydrocarbons can be produced via a single trip through the wellbore. | 04-19-2012 |
20140083675 | Single Trip Multi-Zone Completion Systems and Methods - Disclosed are systems and methods of producing from multiple production zones with a single trip multi-zone completion system. One single trip multi-zone completion system includes an outer completion string having at least one sand screen arranged thereabout and being deployable in an open hole section of a wellbore that penetrates at least one formation zone, a production tubing arranged within the outer completion string and having at least one interval control valve disposed thereon, a control line extending external to the production tubing and being communicably coupled to the at least one interval control valve, and a surveillance line extending external to the outer completion string and interposing the at least one formation zone and the at least one sand screen. | 03-27-2014 |
20140083682 | Single Trip Multi-Zone Completion Systems and Methods - Disclosed are systems and methods of producing from multiple production zones with a single trip multi-zone completion system. One method includes arranging an outer completion string within an open hole section of a wellbore, the outer completion string having at least one sand screen disposed thereabout, extending a production tubing within the outer completion string, the production tubing having at least one interval control valve disposed thereon, communicably coupling the production tubing to the completion string at a crossover coupling having one or more control lines coupled thereto, actuating the at least one interval control valve to initiate production into the production tubing at the at least one interval control valve, and measuring one or more fluid and/or well environmental parameters external to the outer completion string with a surveillance line communicably coupled to one or more control lines at the crossover coupling. | 03-27-2014 |
20140083714 | Single Trip Multi-Zone Completion Systems and Methods - Disclosed are systems and methods of producing from multiple production zones with a single trip multi-zone completion system. One single trip multi-zone completion system includes an outer completion string having at least one sand screen arranged thereabout and an interval control valve coupled to the at least one sand screen, a production tubing communicably coupled to the outer completion string at a crossover coupling, a control line extending external to the production tubing and being communicably coupled to the crossover coupling, and a surveillance line extending from the crossover coupling external to the outer completion string and interposing the at least one formation zone and the at least one sand screen, the surveillance line being communicably coupled to the interval control valve. | 03-27-2014 |