Patent application number | Description | Published |
20100110933 | Change Management of Model of Service - A system for managing a computer implemented service, according to given requirements has a template ( | 05-06-2010 |
20100114618 | Management of Variants of Model of Service - A system for developing a computer implemented service, for deployment on computing infrastructure, generates variants of the model by automatically choosing values for a limited set of design variables, and evaluates the variants in operation. A model manager ( | 05-06-2010 |
20100115490 | Automated Lifecycle Management of a Computer Implemented Service - A system for automated lifecycle management of a computer implemented service, according to requirements, having a service model ( | 05-06-2010 |
20100198960 | AUTOMATED TEST EXECUTION IN A SHARED VIRTUALIZED RESOURCE POOL - In a computer-implemented method for automated test execution in a shared virtualized resource pool, a test description containing at least one model for a service under test (SUT) is received and one or more infrastructure configurations to be tested by resources in the shared virtualized resource pool based upon the test description are identified. In addition, a service lifecycle management (SLiM) tool is interacted with to cause the SUT and a load source to be created, the SLiM tool is directed to instantiate the SUT and the load source on the one or more infrastructure configurations in the shared virtualized resource pool for the SUT, and the SLiM tool and the load source are interacted with to receive performance data related to performance of the SUT under one or more loads generated by the load source. | 08-05-2010 |
20100199130 | SIZING AN INFRASTRUCTURE CONFIGURATION OPTIMIZED FOR A WORKLOAD MIX - Sizing an infrastructure configuration optimized for a workload mix includes: a) instructing a virtualized-aware testing service (VATS) test controller to perform a test of an initial infrastructure configuration in a virtualized environment, in which the test provides at least one test result; b) determining whether the at least one test result satisfies a predetermined requirement as identified in the workload mix; c) modifying at least one parameter of the initial infrastructure configuration to create a modified infrastructure configuration in response to the at least one test result failing to satisfy the predetermined requirement; d) instructing the VATS test controller to perform another test on the modified infrastructure configuration to generate another at least one test result; e) repeating steps b)-d) until a final infrastructure configuration that causes the another at least one test result to satisfy the predetermined requirement is identified; and f) outputting the final infrastructure configuration. | 08-05-2010 |
20100199267 | SIZING AN INFRASTRUCTURE CONFIGURATION OPTIMIZED FOR A WORKLOAD MIX USING A PREDICTIVE MODEL - Sizing an infrastructure configuration optimized for a workload mix includes: receiving the workload mix; identifying demand estimates for the one or more predefined benchmarks; applying a predictive model to identify an initial infrastructure configuration having a size anticipated to meet the demand estimates; instructing a virtualized-aware testing service (VATS) test controller to perform a test of the initial infrastructure configuration in a virtualized environment, where performance of the test generates at least one test result; determining whether the at least one test result satisfies a predetermined requirement as identified in the workload mix; and outputting the determination of whether the at least one test result satisfies the predetermined requirement. | 08-05-2010 |
20120030220 | HETEROGENEOUS DATA SOURCE MANAGEMENT - Management of heterogeneous data sources is described. In accordance with an embodiment method, a plurality of heterogeneous data sources is identified ( | 02-02-2012 |