GUO DIAN TONG NETWORK TECHNOLOGY COMPANY LIMITED Patent applications |
Patent application number | Title | Published |
20140358315 | INTELLIGENT POWER UTILIZATION SYSTEM AND METHOD FOR PARKS - A system for intelligent electric power utilization of park and a method thereof are provided. The system includes an acquisition system, a data processing system, an application system and a service system through which the acquisition system, the data processing system and the application system are connected to external system. The application system includes an intelligent interaction application subsystem, an electric power utilization monitoring application subsystem, an energy efficiency analysis application subsystem, an orderly electric power utilization application subsystem, a system security application subsystem and a man-machine interaction interface. Enterprise users are leaded to actively carry out requirement response. Energy conservation and emission reduction and peak shaving and valley filling are effectively realized in intelligent park. Capability of intelligent electric power utilization of the park is improved. Accordingly, load balancing capability of region is improved and safe and stable operation of the power grid is ensured. | 12-04-2014 |
20140324242 | METHOD AND SYSTEM FOR ANALYZING USER LOADS IN COMBINATION WITH TIME INFORMATION - A method for analyzing a user load in conjunction with time information and a system thereof are provided. In the case that an enterprise operates in a non-full-time operational mode, operation periods of the enterprise are adjusted, electricity prices for respective adjusted operation periods are obtained, and the electricity prices are multiplied with electricity consumptions to obtain electricity charges of the enterprise. In the case that the enterprise operates in a full-time operational mode, electricity consumptions in respective hours of the enterprise are adjusted, the electricity consumptions are multiplied with electricity prices for the respective hours to obtain electricity charges of the respective hours of the enterprise, and the electricity charges of the respective hours are accumulated to obtain a total electricity charge of the enterprise. | 10-30-2014 |